XINFEI INDUSTRY GROUP logo Request A Quote
Browse the site
XINFEI production line

Solution

Packing Documentation And Freight

Getting the parts from Beijing to your workshop with the paperwork right.

Why This Exists

Export of small high value parts fails on paperwork far more often than on production.

How It Works

1

Packing to suit the mode

Wood boxes for heavy and large bore items, paper boxes for small parts, with rust preventive wrapping inside.

2

Express, air, sea or rail

Small urgent items move by DHL, TNT, FedEx or other express services. Larger consignments go by air, by sea or by rail.

3

Documents prepared in advance

Commercial invoice, packing list and the certificates your customs office asks for are prepared before the goods leave.

4

Payment terms confirmed first

L/C, T/T and Western Union are the standard terms, with PayPal available on small orders.

Export packing at XINFEI

Start With What You Have

A part number, a photograph or three measurements. Nothing else is needed to begin.

Answers

Packing Documentation And Freight — Questions And Answers

How long does this take
Identification and quotation normally come back within a working day or two. Production lead time depends on the item and is confirmed in writing with the quotation.
What information should I send first
Whatever you already have: a designation, an OEM number, a photograph of the part, or bore, outside diameter and width measured with a caliper, together with the machine make and model.
Is there a charge for identification
No. Identification and quotation are part of the enquiry.
Can this run alongside an existing supplier
Yes. Most maintenance buyers use more than one source, and this process is designed to slot into an existing parts list rather than replace it.