304 vs 316 Stainless Steel for Outdoor Sculpture
The grade decision costs little at the quotation stage and a great deal once a piece starts pitting. Here is how to make it properly.

Large scale pieces for parks, plazas, civic entrances and landmark developments, detailed for public contact and long sight lines.
Large pieces trial assembled in the workshop, then split at joints chosen during design
Sections marked so they reassemble in the same order on site
Brushed and textured finishes offered where a mirror surface would be too vulnerable at ground level
Structural welding and internal framing sized to the piece rather than to a standard list

Modern Stainless Steel Infinity Sculpture
View details
Stainless Steel Starburst Meteor Hammer Landmine Sculpture
View details
304 316L Mirror-Polished Outdoor Decorative Modern Metal Art
View details
CORTEN Steel Water Bowl
View details
Modern Garden Outdoor Decoration Abstract Art Metal Statue
View details
Modern Large Outdoor Garden Courtyard Rusty Art Statue
View details
Stainless Steel Mirror Creative Leisure Seat Design A
View details
Large Stainless Steel Love Shaped Sculpture
View details
Stainless Steel Mirror Geometry Block Face Leopard Large Metal
View detailsThe full route from a sketch on a napkin to a crated piece with an anchor pattern drawing. This is how most projects here actually run.
Why a mirror finish is a fabrication problem before it is a polishing problem, and how the seams are made to disappear.
How weathering steel is fabricated so the colour arrives settled, the welds do not show, and the run off does not stain the paving.

The grade decision costs little at the quotation stage and a great deal once a piece starts pitting. Here is how to make it properly.

A flawless mirror finish is decided during welding and grinding, long before anyone reaches for a polishing mop.

What weathering steel does over its first years outdoors, what it does to the paving underneath, and what to detail at design stage.

The base plate and the anchor pattern cause more delays on site than anything else. They are also the easiest part to get right in advance.
Directly. Most enquiries come from the designer, the contractor or the operator, and the drawing conversation happens with our own design team rather than through a trading company.
An indicative price can be given from a position, a height and a reference image. A firm price needs the design settled, because the material, the structure and the finish are what drive the cost.
Tell us the real constraint as early as you can. Where access is restricted the piece is split at joints chosen during design, trial assembled in the workshop, then marked so it reassembles in order on site.
We issue the base plate and anchor pattern as a drawing. The foundation itself is normally cast by your own contractor to that drawing, which lets it cure while the piece is still being fabricated.
Send the position, the constraints and the programme. We will tell you what is realistic in which material before you commit to anything.