Packing Sectioning and Shipping Large Sculpture Overseas
More sculpture is damaged between the workshop and the site than in twenty years of service. Most of it is avoidable.

More sculpture is damaged between the workshop and the site than in twenty years of service. This is how that is avoided.
Each stage lists what normally goes wrong at that point, then how it is handled here.
A piece that cannot get through the site access is worthless, however good it is.
Access is checked during design. Where it is tight, the piece is split at joints chosen to fall on lines of the form, trial assembled, then marked in assembly order.
A standard crate leaves a compound curved sculpture bearing on two points.
The crate is built around the finished geometry with foam contact on every finished face and the load taken through the structure, not the surface.
Protective film left on a polished surface in a hot container can bond to it.
Protection is chosen for the transit time and the route, and the removal instruction ships with the piece.
Sculpture sits awkwardly between art and manufactured goods in customs terms.
Packing lists, dimensions and weights are issued with the shipment so your forwarder or ours can book accurately.
Damage found a month after delivery is impossible to claim.
Photographs of the crated and uncrated piece are taken at dispatch, so the condition at handover is documented on both sides.

Stainless Steel Mirror Creative Leisure Seat Design A
View details
Large Stainless Steel Love Shaped Sculpture
View details
Stainless Steel Mirror Geometry Block Face Leopard Large Metal
View details
CORTEN Steel Water Bowl
View details
Modern Garden Outdoor Decoration Abstract Art Metal Statue
View details
Modern Large Outdoor Garden Courtyard Rusty Art Statue
View details
More sculpture is damaged between the workshop and the site than in twenty years of service. Most of it is avoidable.

Lobby pieces have constraints that garden pieces do not: fixed ceilings, live operations and a delivery route through a finished building.
When the design is signed off. Before that a price is indicative, because the material, the structure and the finish are still moving.
All of the fabrication and finishing. Cutting, forming, welding, seam dressing, polishing and packing are done in the same 12,000 square metre building in Shenzhen.
Progress photographs are sent through the build, and the finished piece is stood up and photographed from every side for written approval before it is crated. Workshop visits can be arranged.
Design approval, followed by the foundation. Both are inside the client's control, which is why the base plate and anchor pattern are issued early enough to pour while fabrication is still running.
The cheapest place to solve a fabrication problem is on the drawing. Send what you have and we will tell you what it will cost you later if it stays as it is.