Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Sport Pads › GM Sport Pads › GM Sport Pads 4
GM Sport Pads 4 — brushed stainless face with round rubber studs and a moulded black flank
GM Sport Pads 4 — photographed at Lee World. Brushed stainless face with round rubber studs and a moulded black flank.
GM Sport Pads

GM Sport Pads 4

The flanked version, where the rubber wraps the edge of the plate. It needs a second tool action, which is why we quote it separately from the flat-edged faces.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyOvermoulded finisher plate
ConstructionMetal face with moulded rubber inserts
Face detailBrushed stainless face with round rubber studs and a moulded black flank.
Face finish optionsBrushed aluminium, sand blasted stainless steel or polished stainless steel
Face markingLaser etching available on steel components
Insert compoundsEPDM, SBR, TPE or TPE-SEBS, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Brushed stainless face with round rubber studs and a moulded black flank. It sits in the GM Sport Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

Tooling, and who owns the timing

All tooling is designed and made in house, in the same buildings as the moulding lines in Shanghai and Beijing. That is why parts from a prototype tool take 4 weeks rather than the eight to ten a subcontracted tool would need.

Moving from sample to approved part

Prototype parts prove the shape. PPAP proves the process — that a production tool on a production line makes parts that match the drawing repeatably. We run PPAP to ISO/TS 16949 or VDA, typically over 8 weeks.

What we need to quote it

A drawing in SolidWorks, Pro-E or UG — a STEP export is fine — or the physical sample, which we will measure and model for your approval. Annual volume and the required PPAP standard complete the picture.

Questions buyers ask

Is the rubber overmoulded or pressed in?

We produce both. Overmoulding gives one inseparable part and suits small or pryable inserts; press fit lowers tooling and suits large inserts that their own geometry already retains. Which one applies is set on the drawing before the tool is cut.

How long before I see a real GM Sport Pads 4 sample?

Prototype parts in 4 weeks. That window is also when design changes are cheap — our designers will suggest improvements to the part while the tool can still absorb them.

What do you need from us to quote it?

Native SolidWorks, Pro-E or UG files, or STEP. Add the volume, the duty and the delivery country and we can quote tooling and parts together.

How is the material verified?

Beside the press rather than a week away. Hardness and density catch a mis-weighed batch, Mooney viscosity catches a compound that will not flow the same way tomorrow, and ozone and ageing catch what only shows up years later.

Quote the GM Sport Pads 4

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.