Super Sign Manufacturing Co., Limited · Longgang, Shenzhen 518116
brushed stainless steel sign lettering
Industry

Sign Letters For Banks And Professional Services

Professional practices usually arrive with a serif wordmark, a fixed corporate colour and a building they do not own. All three narrow the build considerably.

Pain Points

What Constrains A Sign In This Setting

Four constraints decide the build before the design does. Each one has a factory answer.

Serif faces have thin strokes

Long thin serifs have to be folded and soldered individually so the return depth stays even where the stroke narrows. There is a minimum workable stroke width, so send artwork before fixing the letter height.

The corporate colour is audited

Powder coated stainless gives the corrosion resistance of metal and the exact colour of a code. The Pantone or RAL reference is confirmed before production and stays on the order for repeat sites.

The landlord will not allow drilling

Powder coated builds are available with back screw bolt, 3M tape or a PVC or foam bottom, chosen to suit the wall. Tape needs a clean, flat, non-porous surface.

Close viewing distance shows the plating

On a door plate read at thirty centimetres, gold-plated steel reads as plating. Solid water jet cut brass does not, which is why the brass builds exist.

Recommended Products

Six Builds That Suit This Work

Product Families

Where To Start In The Catalogue

Delivery Capability

How The Order Reaches Site

Production runs 5 to 7 days on most fabricated and channel letters and 7 to 10 days on lightboxes, flag signs and thick solid acrylic. DHL or UPS express adds roughly 4 to 5 days door to door, and the carton contains the fixing accessories, the 1:1 scale mounting template and, on illuminated orders, the transformer.

From artwork to wall in five stages Artwork approval, material and finish selection, fabrication, illumination and quality check, then export packing and express delivery. 01 Artwork AI / EPS / CDR 02 Material Grade, finish, colour code 03 Fabrication Fold, solder, dress, finish 04 LED and check Wire, seal, light up 05 Express DHL / UPS, 4–5 days day 0 days 1–7 +4–5 days
Solutions And Studies

Related Routes Through The Same Problem

Questions

Banks And Professional Services Signage Questions

Can you make a script or handwriting logo?

Yes. Connected scripts are fabricated as continuous soldered sections rather than split into separate characters, so the stroke flow survives. They are heavier than they look, so the fixing is planned for the whole run.

Will unlacquered brass go dark?

Yes, within months outdoors and more slowly indoors. Say on the order whether you want it lacquered; we do not assume, because some clients want the patina.

Powder coating or wet paint?

Powder coating is baked on and harder wearing. Wet paint suits substrates and geometries that cannot go through the oven. Both are matched to a supplied colour code.

Can we order one door plate?

Yes. There is no minimum order quantity anywhere in this catalogue.

Sign Letters For Banks And Professional Services

Tell us the site, the fascia depth limit and the handover date along with the artwork, and the quotation comes back with a build that fits all three.