Automotive Aftermarket Solution Expert
WA900S 3D wheel aligner with automatic tracking beam and wheel targets
Bay Solutions

Wheel Alignment Bay

An aligner, a lift that can hold the vehicle wheels-free, and the floor work to put them together.

How the Bay Gets Specified

  1. Define the bayCeiling height, slab thickness and whether the floor can be excavated decide between an in-ground scissor lift, a surface ultra-thin lift and a four post lift.
  2. Match lift to alignerThe aligner has to work with the lift you choose; the WA900S works with all car lift types including two post lifts, the WA500 suits a big scissor lift, four post lift or pit.
  3. Specify the secondary liftAlignment needs a wheels-free position, which is what the secondary lifting system on the ASL and AFL models provides.
  4. Plan the civil workWe send the foundation drawing before the pit is cut so the pocket is right the first time.
  5. Commission and hand overSet the beam, run a reference vehicle and check the printed before-and-after report.

Equipment in This Solution

Every machine below is in the published range, with its own specification page.

From Enquiry to Handover

What We Handle at Each Stage

Survey

Bay dimensions, ceiling height, slab condition and vehicle mix.

Specify

Machines matched to the constraints, with the trade-offs stated.

Drawings

Anchor pattern, slab specification and pit drawing before civil work.

Build

Built to your local voltage and frequency, then crated for container loading.

Commission

Technical support through installation, calibration and first use.

Related Guides

Frequently Asked Questions

Can you quote the whole bay in one go?

Yes, and it is usually cheaper. Machines shipped together share the container space, which lowers the freight cost per unit.

What information do you need to specify the bay?

Bay dimensions, ceiling height, slab condition, whether the floor can be cut, your vehicle mix and your local voltage.

Do you supply the drawings before the civil work starts?

Yes. For in-ground equipment we send the foundation drawing before the pit is cut, so the pocket is right the first time.

Who installs the equipment?

Installation is carried out locally by a competent installer. We supply the drawings, the manual and technical support during commissioning.

Can we phase the purchase?

Yes. Several machines are supplied with upgrade paths, such as reserved mounting holes for an assistant arm on the ATC830 and ATC850.

Specify a Wheel Alignment Bay

Send the bay dimensions, the ceiling height and what you take in. We will come back with the equipment list, the price and the drawings.