Automotive Aftermarket Solution Expert
B-15EA 1.5T battery removal lift with adjustable platform
Bay Solutions

EV and New Energy Service Bay

Getting a battery pack out from under the car safely, and servicing the air conditioning system that goes with it.

How the Bay Gets Specified

  1. Raise the vehicleA lift with enough clear height under the car to take the pack out on a table.
  2. Support the packAn adjustable-angle battery table takes the weight and aligns the pack with the underbody.
  3. Keep the operator clearA wireless control handle means nobody stands next to the load while it moves.
  4. Move the pack outMobile pulleys let the pack leave the bay rather than sit under the car.
  5. Service the A/C correctlyElectrified compressors use POE oil, so the station has to inject the right oil type.

Equipment in This Solution

Every machine below is in the published range, with its own specification page.

From Enquiry to Handover

What We Handle at Each Stage

Survey

Bay dimensions, ceiling height, slab condition and vehicle mix.

Specify

Machines matched to the constraints, with the trade-offs stated.

Drawings

Anchor pattern, slab specification and pit drawing before civil work.

Build

Built to your local voltage and frequency, then crated for container loading.

Commission

Technical support through installation, calibration and first use.

Related Guides

Frequently Asked Questions

Can you quote the whole bay in one go?

Yes, and it is usually cheaper. Machines shipped together share the container space, which lowers the freight cost per unit.

What information do you need to specify the bay?

Bay dimensions, ceiling height, slab condition, whether the floor can be cut, your vehicle mix and your local voltage.

Do you supply the drawings before the civil work starts?

Yes. For in-ground equipment we send the foundation drawing before the pit is cut, so the pocket is right the first time.

Who installs the equipment?

Installation is carried out locally by a competent installer. We supply the drawings, the manual and technical support during commissioning.

Can we phase the purchase?

Yes. Several machines are supplied with upgrade paths, such as reserved mounting holes for an assistant arm on the ATC830 and ATC850.

Specify a EV and New Energy Service Bay

Send the bay dimensions, the ceiling height and what you take in. We will come back with the equipment list, the price and the drawings.