
EV and New Energy Service Bay
Getting a battery pack out from under the car safely, and servicing the air conditioning system that goes with it.
How the Bay Gets Specified
- Raise the vehicleA lift with enough clear height under the car to take the pack out on a table.
- Support the packAn adjustable-angle battery table takes the weight and aligns the pack with the underbody.
- Keep the operator clearA wireless control handle means nobody stands next to the load while it moves.
- Move the pack outMobile pulleys let the pack leave the bay rather than sit under the car.
- Service the A/C correctlyElectrified compressors use POE oil, so the station has to inject the right oil type.
Equipment in This Solution
Every machine below is in the published range, with its own specification page.




What We Handle at Each Stage
Survey
Bay dimensions, ceiling height, slab condition and vehicle mix.
Specify
Machines matched to the constraints, with the trade-offs stated.
Drawings
Anchor pattern, slab specification and pit drawing before civil work.
Build
Built to your local voltage and frequency, then crated for container loading.
Commission
Technical support through installation, calibration and first use.
Related Guides
Two Post or Scissor Lift for a General Repair Bay
The choice is usually decided by the building rather than the vehicles. Here is how ceiling height, slab condition and the work you take in point to one or the other.
R134a and R1234yf What Changes in the Service Bay
Two refrigerants now share the road, and one machine cannot always serve both. Here is what actually differs and how to decide between separate stations and a dual system machine.
What to Check Before a Workshop Lift Is Delivered
Most installation problems are decided weeks before the crate arrives. These are the checks that stop a lift turning up for a bay that cannot take it.
Frequently Asked Questions
Can you quote the whole bay in one go?
Yes, and it is usually cheaper. Machines shipped together share the container space, which lowers the freight cost per unit.
What information do you need to specify the bay?
Bay dimensions, ceiling height, slab condition, whether the floor can be cut, your vehicle mix and your local voltage.
Do you supply the drawings before the civil work starts?
Yes. For in-ground equipment we send the foundation drawing before the pit is cut, so the pocket is right the first time.
Who installs the equipment?
Installation is carried out locally by a competent installer. We supply the drawings, the manual and technical support during commissioning.
Can we phase the purchase?
Yes. Several machines are supplied with upgrade paths, such as reserved mounting holes for an assistant arm on the ATC830 and ATC850.
Specify a EV and New Energy Service Bay
Send the bay dimensions, the ceiling height and what you take in. We will come back with the equipment list, the price and the drawings.