Xi'an Industrial Machinery Co., Ltd — machine tools since the 1990s
Engine rebuilding machinery finished and ready for inspection. Engine machines are function tested on sample c
Quality and Works

What Happens Before the Crate Is Closed

What the works actually contains, and what happens to a machine before it is crated.

Production Equipment

The Machines That Build Our Machines

A machine tool cannot be more accurate than the equipment that produced it. This is what we run.

  • Kuraki boring and milling machine (Kurashiki, Japan)
  • DIXI precision coordinate boring machine (Switzerland)
  • Precision rail grinder
  • High-speed laser cutting machine
  • Fully computerised automatic sheet-metal spraying line
  • 100-ton medium-temperature tempering furnace
  • 15,000 m² constant-temperature assembly workshop
Quality Process

From Component to Crate

Component inspection

Incoming and in-process checking of machined components against drawing before they reach assembly

Stress relief

Structures tempered in the 100-ton medium-temperature furnace so they are stable before final machining

Precision machining

Critical bores and ways machined on the Kuraki and DIXI machines and the precision rail grinder

Constant-temperature assembly

Machines assembled in the 15,000 m² constant-temperature workshop to keep geometry from drifting during build

Function test

Machines run through their operating cycle by the inspection department before painting

Paint and pack

Finished on the automatic sheet-metal spraying line, then crated for sea freight

Photographs

The Works and the Shipments

A completed surface grinding machine at the works. Machines are assembled, run and checked before they are pai
A completed surface grinding machine at the works. Machines are assembled, run and checked before they are painted and crated.
Engine rebuilding machinery finished and ready for inspection. Engine machines are function tested on sample c
Engine rebuilding machinery finished and ready for inspection. Engine machines are function tested on sample castings, not just checked dimensionally.
A crated machine loaded for the port. Machines are crated for sea freight and consolidated so a full line arri
A crated machine loaded for the port. Machines are crated for sea freight and consolidated so a full line arrives together.
The team at Metaltech Malaysia 2022 in Kuala Lumpur, showing engine rebuilding and valve refacing equipment wi
The team at Metaltech Malaysia 2022 in Kuala Lumpur, showing engine rebuilding and valve refacing equipment with a local engineering partner.
Machining, assembly, inspection and finishing at the Xi'an works.
Machining, assembly, inspection and finishing at the Xi'an works.
A cylinder block and cylinder head pressure tester completed and function tested before despatch.
A cylinder block and cylinder head pressure tester completed and function tested before despatch.
Commercial Terms

How We Trade

Trade termsFOB, CFR, CIF
Payment terms30% T/T on order, 70% before shipment; or irrevocable L/C at sight
Alibaba Trade Assurance limitUS$300,000
PackingCrated for sea freight, consolidated shipment available

We do not publish certification marks we cannot evidence. Where an individual machine carries a certification, it is stated on that machine's own page. If you need documentation for import clearance, tell us the market and we will confirm what we can supply before you order.

Ask Us Anything About the Works

Questions about how a machine is built, inspected or packed are the easiest ones for us to answer. Send them before you order, not after.