FF&E sourcing and procurement for hospitality, airport, hospital, residential and commercial projects [email protected] WhatsApp +86 135 4257 6397
Songdom engineer checking a hotel table lamp against the technical drawing during QA inspection
Service

Custom Manufacturing and Value Engineering

Extensive pool of qualified factory suppliers with differentiated manufacturing expertise, varying production capacity and cost structure. Strategic supplier matching lets a project optimise cost while turning a custom design concept into a finished product.

How It Works

Step By Step

  1. 1

    Design intent review

    We take the designer's drawing and identify what drives cost, what drives lead time and what will not pass certification as drawn.

  2. 2

    Material and process alternatives

    A different base material, finish process or assembly method often holds the visual intent at a materially lower cost.

  3. 3

    Prototype and approval

    A pre-production sample is built and reviewed against the drawing before mass materials are committed.

  4. 4

    Certification path

    The listing route is decided during design, not discovered during final inspection.

  5. 5

    Production release

    Once the sample and the certification path are both approved, the factory is released to mass production against a fixed specification.

Outcomes

What Changes For Your Project Team

  • Design concepts realised as manufactured products
  • Cost optimised without losing design intent
  • Certification designed in rather than retrofitted
  • Fixed specification before mass production
Songdom engineer checking a hotel table lamp against the technical drawing during QA inspection
FAQ

Custom Manufacturing and Value Engineering Questions

What is included in custom manufacturing and value engineering?

Extensive pool of qualified factory suppliers with differentiated manufacturing expertise, varying production capacity and cost structure. Strategic supplier matching lets a project optimise cost while turning a custom design concept into a finished product.

Is this available on its own or only as part of a full package?

It can be run on its own, though most projects take it as part of the full sourcing programme so that the inspection and delivery stages connect to the same supplier relationship.

How early should we involve you?

At specification stage. The cheapest quality and cost decisions are made during drawing review, before anything is tooled or released to production.

How do you report progress?

Through the inspection record at each gate, with photographs and measurements taken at the factory as the production run proceeds.

What does it cost?

It is quoted per project, because the scope depends on the number of categories, the number of factories and the duration of the production programme.

Talk To Songdom

Bring Songdom In On Custom Manufacturing and Value Engineering

The earlier the specification is reviewed, the cheaper every later decision becomes.