Client Background

The Property

Al Wajh Airport serves the north-western Red Sea coast of Saudi Arabia. Its public restrooms required the same integrated washroom approach adopted at Red Sea International Airport.

SectorAirport
LocationAl Wajh Airport, Saudi Arabia
Songdom scopeIntegrated public washroom mirror cabinet systems
Project Challenge

What Made It Hard

Rolling the same washroom system into a second terminal means the specification has to be repeatable. The cabinet widths change with the wall, but the device layout, the service access and the compliance position all have to stay identical so the operator maintains one system rather than two.

Customer Pain Points

  • Repeating a bespoke system across a second terminal without redesigning it
  • Washroom wall dimensions differing between the two buildings
  • Maintaining a single service procedure across both airports
  • Heavy-use conditions in passenger restrooms
Our Solution

What Songdom Did

Songdom delivered custom-built public washroom mirror cabinet systems for the high-traffic restrooms at Al Wajh Airport, with integrated touch-free soap dispensers, hand dryers and paper towel dispensers in the same concealed configuration used at Red Sea International Airport.

Integrated soap dispenser inside a public washroom mirror cabinet
Procurement And Supply Chain

How The Programme Ran

  1. 1

    Elevation review against the second terminal's wall build-up

  2. 2

    Device layout carried over from the first installation

  3. 3

    Pre-production sample approval

  4. 4

    Incoming device and material inspection

  5. 5

    Function testing of every integrated device

  6. 6

    Final inspection and shipment

Quality Control

What Was Inspected

Each cabinet was function-tested as a complete assembly, with device operation, lighting and service access verified against the configuration already proven at the first terminal.

Final Result

Outcome

Both Saudi terminals now run the same concealed integrated washroom solution, so the operator maintains one system, one service procedure and one spares list across two airports.

Customer Benefit

What The Client Did Not Have To Do

  • Repeatable specification across two terminals
  • One service procedure for the operator
  • Cabinet widths adapted to each wall without changing the system
  • Touch-free dispensing throughout
Project Gallery

Photographs From This Project

FAQ

Questions About This Project

What was Songdom's scope on this project?

Integrated public washroom mirror cabinet systems. Songdom delivered custom-built public washroom mirror cabinet systems for the high-traffic restrooms at Al Wajh Airport, with integrated touch-free soap dispensers, hand dryers and paper towel dispensers in the same concealed configuration used at Red Sea International Airport.

How was quality controlled?

Each cabinet was function-tested as a complete assembly, with device operation, lighting and service access verified against the configuration already proven at the first terminal.

Who handled shipping?

Songdom coordinates shipment from the manufacturing factories, aligning delivery with the project programme so the client does not carry the freight coordination.

Can you deliver a similar package for our project?

Yes. Send the FF&E schedule, the drawings and the programme, and we will come back with the category plan, the certification route and the production window.

Talk To Songdom

Have A Similar Project

Send the FF&E schedule and the opening date. We will tell you what is buildable, what needs a substitution and what it will take to hold the programme.