Airport Project Solutions

Songdom sources and procures a full range of fit-out products for airport terminal projects, including sanitary fixtures, commercial-grade lighting, custom furniture, flooring materials, FIDS flight information display panels and advertising display walls.

Sector Pain Points

What Makes Airport Procurement Different

Public-zone duty cycle

Terminal furniture and fixtures run 20 hours a day, every day, in front of passengers who are tired and in a hurry. Commercial-grade is the floor, not the ceiling.

Single-source risk

An airport package that depends on one factory per category has no recovery path. We maintain at least three manufacturing suppliers for every product category.

Phased handover

Terminals open pier by pier and gate by gate. Deliveries have to be consolidated and sequenced to the zone that is actually ready.

Maintenance access

Anything that has to be refilled, relamped or reset during operating hours must be reachable without closing the zone.

Delivery Capability

How The Programme Runs

  1. 1

    Scope and specification review

    We read the FF&E schedule, the drawing set and the brand standard together, and we list what is actually buildable, what needs a substitution and what is missing.

  2. 2

    Supplier matching

    Each category goes to a factory chosen for that category, not to whichever supplier is already in the room. Capacity, cost structure and project experience differ sharply between manufacturers.

  3. 3

    Quotation and value engineering

    Where a specification drives cost without serving the design, we put an alternative on the table with the compliance position attached.

  4. 4

    Sampling and approval

    Pre-production samples are checked against the drawing and the approved finish before mass materials are released.

  5. 5

    Production management

    We hold the production schedule against the opening date and escalate early when a factory starts to drift.

  6. 6

    Inspection

    Incoming material, in-process and final inspection, all before the carton is sealed.

  7. 7

    Consolidation and shipment

    Categories are consolidated and sequenced so the site receives what it can install, when it can install it.

FAQ

Airport Procurement Questions

What does Songdom supply for airport projects?

Songdom sources and procures a full range of fit-out products for airport terminal projects, including sanitary fixtures, commercial-grade lighting, custom furniture, flooring materials, FIDS flight information display panels and advertising display walls.

How do you handle brand or authority standards?

We work from the published standard and the approved drawing set, reconcile the two before production, and flag anything that cannot be built or certified as specified.

Can you cover several categories on one project?

Yes. Managing procurement across all product categories is the core of the service, and it is what removes the multi-supplier coordination workload from your team.

How is delivery sequenced?

Against your construction and handover programme. Deliveries are consolidated so the site receives what it can install, when it can install it.

Which certifications are available?

UL, ETL, cUPC, FCC, FDA, UKCA, CE, SAA, WRAS, RoHS, IP44, WaterSense and ISO across the supply base, selected for the destination market.

Talk To Songdom

Planning A Airport Project

Send the FF&E schedule and the programme. We will come back with the category plan, the certification route and the delivery sequence.