C9400-SUP-1
Cisco Catalyst 9400 Series Supervisor 1 Module. The published specification for C9400-SUP-1 lists a published per-slot switching capacity of 80 Gbps.

Cisco Catalyst 9400 Series 48-Port POE 10/100/1000 (RJ-45). The published specification for C9400-LC-48P= lists 48 number of ports. The trailing equals sign identifies C9400-LC-48P= as the spare form of the part, ordered on its own rather than as part of a sys...
Cisco Catalyst 9400 Series 48-Port POE 10/100/1000 (RJ-45). The published specification for C9400-LC-48P= lists 48 number of ports. The trailing equals sign identifies C9400-LC-48P= as the spare form of the part, ordered on its own rather than as part of a system, which is how it is normally bought into a held spares pool. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warranty as standard.
48 number of ports on this part number, so the closet design is checked against the real layout rather than against a family datasheet that covers several models.
Modules optics rails and power options are reviewed against C9400-LC-48P= before the quotation is issued, so the install crew is not blocked by a line nobody costed.
A vendor support contract for C9400-LC-48P= is written under the end customer name, so the entitlement sits with the organisation that owns the outage.
The serial list for your C9400-LC-48P= consignment is released before despatch, so it can be checked on the manufacturer portal while the goods are still with us.
Bidding work that needs firm pricing and a written lead time before the end client is quoted
Standardising hardware across many customer sites and needing the same SKU available again
Replacing equipment that has reached end of support before an audit rather than after one
Adding capacity in defined increments as cabinets and rows fill up
As published by Cisco for this part number. Full electrical, port and performance specifications are issued with the quotation against the current datasheet revision.
| Number of ports | 48 |
|---|---|
| Port Speed | 10/100/1000 |
| Port type | RJ-45 POE+ IEEE 802.3at, IEEE 802.3af, Cisco pre-standard |
| Cisco Catalyst 9400 Series switch min/max ports | C9404R: 48/96 C9407R: 48/240 C9410R: 48/384 |
| Max rated power (W) | 65 |
| Rated MTBF (hours) | 980,440 |
| Part Number | C9400-LC-48P= |
|---|---|
| Brand | Cisco |
| Category | Cisco Catalyst 9400 |
| Product Condition | New factory sealed |
| Serial Traceability | Full serial list supplied before shipment |
| Warranty | 12 months replacement plus optional vendor support contract |
| Packaging | Original vendor carton with export grade outer |
| Lead Time | Confirmed in writing per line at quotation |
| Delivery | Worldwide courier or freight from Hong Kong |
Values are taken from each manufacturer specification. A blank means the manufacturer does not publish that attribute for that model.
| Attribute | C9400-LC-48P= | C9400-SUP-1 | C9400-SUP-1/2 | C9400-SUP-1= |
|---|---|---|---|---|
| Ports | 48 | - | - | - |
| Port Speed | 10/100/1000 | - | - | - |
| Max rated power (W) | 65 W | - | - | - |
| Rated MTBF | 980,440 hours | 302,000 hours | 302,000 hours | 302,000 hours |
| Throughput | - | 80 Gbps | 80 Gbps | 80 Gbps |
| MAC Table | - | Up to 64K | Up to 64K | Up to 64K |
| Product page | View C9400-LC-48P= | View C9400-SUP-1 | View C9400-SUP-1/2 | View C9400-SUP-1= |
Check C9400-LC-48P= character for character including any suffix. On this class of hardware a single trailing character commonly changes the software tier, the power option, or whether a bundle is included.
Confirm rack space, power feed, cabling and any uplink or accessory dependency before the order rather than on the day of installation.
Photograph the sealed carton, reconcile the serial against the list supplied before shipment, then open and confirm the unit matches the label.
Power the unit, capture the software version and the port or drive inventory, and record it while the unit is still accessible.
Register the support contract under the end user name so the entitlement sits with the organisation that owns the outage.
Cisco Catalyst 9400 Series Supervisor 1 Module. The published specification for C9400-SUP-1 lists a published per-slot switching capacity of 80 Gbps.
Cisco Catalyst 9400 Series Redundant Supervisor 1 Module. The published specification for C9400-SUP-1/2 lists a published per-slot switching capacity
Cisco Catalyst 9400 Series Supervisor 1 Module. The published specification for C9400-SUP-1= lists a published per-slot switching capacity of 80 Gbps.
Cisco Catalyst 9400 Series Supervisor 1XL Module. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replace
Cisco Catalyst 9400 Series Supervisor 1XL-Y with 25G Module. The published specification for C9400-SUP-1XL-Y lists a published per-slot switching capa
Cisco Catalyst 9400 Series Redundant Supervisor 1XL-Y with 25G Module C9400-SUP-1XL-Y/2 - Cisco Catalyst 9400 Switches Module. The /2 suffix identifie
Cisco Catalyst 9400 Series Redundant Supervisor 1XL Module. The /2 suffix identifies C9400-SUP-1XL/2 as the redundant unit in a pair, ordered alongsid
Cisco Catalyst 9400 Series 4 slot chassis. The Cisco Catalyst 9400 Series switches are Cisco's leading modular enterprise switching access platform bu
Top of rack switching, compute and storage delivered in the phased increments a cabinet build actually consumes.
Access, distribution and wireless supplied to one standard so every closet in every building behaves the same way.
Repeatable CPE and aggregation hardware supplied at the volume and consistency a managed service contract depends on.
Wireless projects are rarely stopped by the access point. They are stopped by a mount, a PoE class or a licence count that nobody confirmed before the order went out.
A cabinet is commissioned as a unit, so it should be supplied as one. Switches, optics, rails and power leads belong in the same consignment.
A support contract registered under a reseller name is of limited use to the organisation that owns the outage. Entitlement is written under the end user name.
The tender required a firm price and date at submission, months before any award, across a bill of materials of several hundred lines
Each site had bought its own network hardware locally, so no two plants ran the same equipment and no spares could be shared
Refresh programmes fail on supply far more often than on design. This is the sequence that keeps a phased rollout on its dates.
Checks that cost minutes on arrival and save a great deal later. Most of them can be done before the carton is opened.
The choice is rarely about quality. It is about entitlement, traceability and what happens eighteen months after the invoice is paid.
Standard supply is new factory sealed in the original vendor carton. If a quotation offers another condition that is stated explicitly in writing before you commit.
Yes. Serials are issued before shipment so you can check them on the manufacturer portal while the goods are still with us.
Availability is confirmed in writing per line at quotation rather than as a project average, because one late line is what moves an installation date.
12 months replacement as standard. A vendor support contract is available separately and is registered under the end user name.
They are quoted as separate lines and reviewed against the chassis before the quotation is issued, so they reach site in the same consignment as the unit they belong to.
The manufacturer does not publish an available PoE figure for this model, which normally indicates a data only variant. Where powered devices are in the design, confirm the port type letter in the part number before ordering.
Yes. Consignments go worldwide by courier or freight from Hong Kong, with the routing chosen against the destination clearance regime and your deadline.
Yes. Consignments can be released directly to an end customer address under your own documentation.
Send the quantity and destination country. Availability and lead time come back in writing, with the serial list before shipment.