New factory sealed hardware from Hong Kong · serial list before shipment
Industry Application

Campus Network Hardware for Schools and Universities

Wireless density and access capacity delivered against academic calendars and fixed budget years.

  • Delivery inside a vacation window
  • Density capable wireless
  • Firm pricing held across a budget year
  • Phased delivery by building
Hardware racked and labelled for Education projects

Stock racked by part number so allocation against a project is a physical check.

Industry Pain Points

What Slows These Projects Down

  • Work confined to vacation windows which makes a late delivery a full term delay
  • Lecture theatre density that a coverage based wireless design cannot carry
  • Budget released in a financial year that does not align with the install window
  • Estates spanning buildings of very different ages and cabling standards
Typical Scenarios

How Hardware Is Actually Deployed Here

Vacation Rollout

Access switching and access points delivered building by building inside a fixed vacation window

Density Upgrade

Lecture theatres and libraries re-covered for concurrent client counts rather than floor area

Halls of Residence

Repeatable low cost access capacity across many small closets

Research Network

Higher capacity uplinks and optics added for data intensive departments

Recommended Hardware

Groups That Fit This Sector

31 models

Wireless

HPE Aruba and Huawei access points and controllers for campus, education and healthcare density, supplied with the mount and injector question settled before despatch.

177 models

Switches

Access stacks, distribution and top of rack switching from Cisco Aruba and Huawei. PoE budget, uplink module and software tier are confirmed per line before the quotation goes out.

21 models

Networking Accessories

Cisco and Huawei transceivers, uplink modules and interface cards matched to the platform, the reach and the fibre already installed.

Frequently Supplied

Models Moving Into Education Projects

Huawei

S5735-L24P4X-A1

Built on next-generation, high-performance hardware and powered by Huaweis Versatile Routing Platform (VRP), CloudEngine S5735-L switches feature flex

Huawei

S5735-L24T4X-A1

Built on next-generation, high-performance hardware and powered by Huaweis Versatile Routing Platform (VRP), CloudEngine S5735-L switches feature flex

Cisco

C9200-24P-A

C9200-24P-A is the Catalyst 9200 24-port PoE+ Switch, with Network Advantage software. Cisco Catalyst 9200 Series switches extend the power of intent-

Cisco

C9200-24P-E

C9200-24P-E is the Catalyst 9200 24-port PoE+ Switch, with Network Essentials software. Cisco Catalyst 9200 Series switches extend the power of intent

Cisco

C9200-24T-E

C9200-24T-E is the Catalyst 9200 24-port Data Switch, with Network Essentials software. Cisco Catalyst 9200 Series switches extend the power of intent

Cisco

C9200-48P-A

C9200-48P-A is the Catalyst 9200 48-port PoE+ Switch, with Network Advantage software. Cisco Catalyst 9200 Series switches extend the power of intent-

Cisco

C9200-48P-E

C9200-48T-E is the Catalyst 9200 48-port Data Switch, with Network Essentials software. Cisco Catalyst 9200 Series switches extend the power of intent

Cisco

C9200-48T-A

C9200-48T-A is the Catalyst 9200 48-port Data Switch, with Network Advantage software. Cisco Catalyst 9200 Series switches extend the power of intent-

Solutions

Programmes We Run in This Sector

Campus Wireless Deployment

Wireless projects are rarely stopped by the access point. They are stopped by a mount, a PoE class or a licence count that nobody confirmed before the order went out.

Network Refresh Programme

Most refresh projects fail on supply rather than on design. A phased programme only works if every phase arrives complete on the date the change window was booked.

Support Contracts and SmartNet

A support contract registered under a reseller name is of limited use to the organisation that owns the outage. Entitlement is written under the end user name.

Project Cases

Project Cases in This Sector

Knowledge Center

Guides for This Sector

FAQ

Education Supply Questions

What Does Education Supply Actually Involve

Wireless density and access capacity delivered against academic calendars and fixed budget years. Hardware is allocated against the project and released against the installation calendar rather than shipped as one consignment.

Can Hardware Be Held Against a Phased Rollout

Yes. Allocating the full quantity early holds the price and protects against a mid programme discontinuation, while delivery stages against your calendar.

Do You Supply Serial Level Records

Yes, on every consignment. Serial lists are issued before shipment and can be grouped per site so each crew reconciles against its own list.

Can You Deliver Direct to Each Site

Yes. Consignments go worldwide from Hong Kong and can be released to individual site addresses under your own documentation.

Talk Through a Education Requirement

Send the site count, the change window and the bill of materials. Availability comes back in writing per line.