New factory sealed hardware from Hong Kong · serial list before shipment
Industry Application

Data Center Network and Compute Hardware Supply

Top of rack switching, compute and storage delivered in the phased increments a cabinet build actually consumes.

  • Complete rack kits
  • Firm lead times per line
  • Serial traceability
  • The same part numbers repeatable over years
Hardware racked and labelled for Data Center projects

Stock racked by part number so allocation against a project is a physical check.

Industry Pain Points

What Slows These Projects Down

  • Cabinet build outs stall when top of rack switches optics and rails arrive as three separate consignments
  • Capacity is added in small increments so a six week lead time on one SKU blocks an entire row
  • Mixed optic batches produce inconsistent link budgets across nominally identical uplinks
  • Spares depth for an older generation disappears while that generation is still carrying production
Typical Scenarios

How Hardware Is Actually Deployed Here

Row Expansion

Two cabinets added per quarter, each with a matched pair of top of rack switches, optics and rails shipped as a single kit

Compute Refresh

A server generation replaced node by node with rails caddies and controllers quoted against the chassis

Storage Growth

Expansion shelves and matched drives supplied against the installed array firmware level

Spares Pool

A held spares pool against the same part numbers so a failure is a swap rather than a purchase cycle

Recommended Hardware

Groups That Fit This Sector

89 models

Servers

HPE ProLiant rack servers plus the drives, memory, controllers, power supplies and rail kits that have to be quoted against the same chassis generation.

5 models

Storages

HPE storage capacity supplied against the existing array and its firmware level, so an expansion behaves like the shelf already in the rack.

177 models

Switches

Access stacks, distribution and top of rack switching from Cisco Aruba and Huawei. PoE budget, uplink module and software tier are confirmed per line before the quotation goes out.

21 models

Networking Accessories

Cisco and Huawei transceivers, uplink modules and interface cards matched to the platform, the reach and the fibre already installed.

Frequently Supplied

Models Moving Into Data Center Projects

Cisco

QSFP-100G-AOC20M

100GBASE QSFP Active Optical Cable, 20m. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warr

Cisco

QSFP-100G-AOC25M

100GBASE QSFP Active Optical Cable, 25m. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warr

Cisco

QSFP-100G-AOC2M

The QSFP-100G modules are Cisco's new generation of 100G transceiver modules solution based on a QSFP form factor. 100GBASE QSFP Active Optical Cable,

Cisco

QSFP-100G-AOC30M

100GBASE QSFP Active Optical Cable, 30m. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warr

Huawei

OSX010000

Huawei OSX010000 is a 10G Optical Transceiver. It's a Single-mode Module. The published specification for OSX010000 lists a published transmission spe

Huawei

SFP-25G-SR

Huawei SFP-25G-SR Module adopts hot-swappable SFP28 package, working wavelength is 850nm, it is a full-duplex transceiver module. Its maximum speed is

Huawei

SFP-GE-LX-SM1310

Huawei SFP-GE-LX-SM1310 is Optical Transceiver. It's a Single-mode Module. It is supplied new factory sealed, with the serial list issued before shipm

Huawei

eSFP-GE-SX-MM850

Huawei eSFP-GE-SX-MM850 is Optical Transceiver. It's a Multi-mode Module. The published specification for eSFP-GE-SX-MM850 lists a published transmiss

Solutions

Programmes We Run in This Sector

Server and Storage Supply

A server order is judged on whether the node goes in on the booked date, which depends almost entirely on the parts that are not the server.

Project Cases

Project Cases in This Sector

Knowledge Center

Guides for This Sector

FAQ

Data Center Supply Questions

What Does Data Center Supply Actually Involve

Top of rack switching, compute and storage delivered in the phased increments a cabinet build actually consumes. Hardware is allocated against the project and released against the installation calendar rather than shipped as one consignment.

Can Hardware Be Held Against a Phased Rollout

Yes. Allocating the full quantity early holds the price and protects against a mid programme discontinuation, while delivery stages against your calendar.

Do You Supply Serial Level Records

Yes, on every consignment. Serial lists are issued before shipment and can be grouped per site so each crew reconciles against its own list.

Can You Deliver Direct to Each Site

Yes. Consignments go worldwide from Hong Kong and can be released to individual site addresses under your own documentation.

Talk Through a Data Center Requirement

Send the site count, the change window and the bill of materials. Availability comes back in writing per line.