Project Case · Data Center

System Integrator Data Center Tender

The tender required a firm price and date at submission, months before any award, across a bill of materials of several hundred lines

Sealed stock allocated in one block for the System Integrator Data Center Tender programme

Allocation on award meant the integrator's submitted date was still achievable at the point the decision came back

Client Background

A system integrator responding to a data centre tender with a fixed price and a fixed delivery date

The Constraint That Mattered

The tender required a firm price and date at submission, months before any award, across a bill of materials of several hundred lines

Customer Pain Points

What Was Actually Going Wrong

  • A single unpriced accessory line can turn a won tender into a loss
  • Lead times quoted as a project average hide the one line that will be late
  • Pricing that expires before the award decision is made
Our Solution

What We Did About It

The submitted bill of materials was reviewed line by line for missing modules, optics, rails and accessories, then priced with availability and lead time confirmed in writing against each line.

  1. Step 1

    Bill of materials reviewed for omissions before any price was given

  2. Step 2

    Availability and lead time confirmed per line rather than as a project figure

  3. Step 3

    Pricing held for the tender validity period

  4. Step 4

    Stock allocated against the project on award rather than re-quoted

Supply Chain Coordination

Allocation on award meant the integrator's submitted date was still achievable at the point the decision came back

Quality Control

Serial lists were issued before shipment so the integrator could hand a complete asset record to the end client at handover

Final Result

A tender response the integrator could stand behind on both price and date

Customer Benefit

The integrator carries a known bill of materials into the bid instead of an estimate with gaps in it

Related Products

Hardware Supplied on This Programme

Cisco

QSFP-100G-AOC25M

100GBASE QSFP Active Optical Cable, 25m. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warr

Cisco

QSFP-100G-AOC2M

The QSFP-100G modules are Cisco's new generation of 100G transceiver modules solution based on a QSFP form factor. 100GBASE QSFP Active Optical Cable,

Cisco

QSFP-100G-AOC30M

100GBASE QSFP Active Optical Cable, 30m. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warr

Huawei

OSX010000

Huawei OSX010000 is a 10G Optical Transceiver. It's a Single-mode Module. The published specification for OSX010000 lists a published transmission spe

Huawei

SFP-25G-SR

Huawei SFP-25G-SR Module adopts hot-swappable SFP28 package, working wavelength is 850nm, it is a full-duplex transceiver module. Its maximum speed is

Huawei

SFP-GE-LX-SM1310

Huawei SFP-GE-LX-SM1310 is Optical Transceiver. It's a Single-mode Module. It is supplied new factory sealed, with the serial list issued before shipm

Solutions

Programmes Behind This Case

Industries

Sector Page

Data Center

Top of rack switching, compute and storage delivered in the phased increments a cabinet build actually consumes.

FAQ

Questions About This Project

Can You Name the Client

No. Client identities are described by sector and scale rather than by name, which is a condition of most of the programmes we work on.

Could This Approach Work for a Smaller Estate

Yes. The mechanics of one standard, per site kits and a serial list per site scale down as readily as they scale up.

How Long Does a Programme Like This Take

It is set by the change windows the business grants rather than by supply. That is why the wave plan is built against booked windows rather than an ideal calendar.

What Would the First Conversation Cover

The estate audit. Until the deployed part numbers and support status are in one list, scope is an estimate.

Describe an Estate and We Will Describe the Programme

Site count, current hardware and the change windows you can get. That is enough for a first scope.