C9300-NM-2Y
Catalyst 9300 2 x 25G Network Module. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warrant

The Cisco Catalyst 9300 Series Switches are Cisco's lead stackable enterprise switching platform built for security, IoT, mobility, and cloud. C9300-48P-E is 48-port PoE+, Network Essentials Switch of 9300 series. Catalyst 9300 Series are the next generation o...
The Cisco Catalyst 9300 Series Switches are Cisco's lead stackable enterprise switching platform built for security, IoT, mobility, and cloud. C9300-48P-E is 48-port PoE+, Network Essentials Switch of 9300 series. Catalyst 9300 Series are the next generation of the industry's most widely deployed switching platform. At 480 Gbps, they are the industry's highest-density stacking bandwidth solution with the most flexible uplink architecture. The Catalyst 9300 Series is the first optimized platform for high-density 802.11ac Wave2. It sets new maximums for network scale. These switches are also ready for the future, with an x86 CPU architecture and more memory, enabling them to host containers and run third-party applications and scripts natively within the switch. The published specification for C9300-48P-E lists 48 POE+ Total 10/100/1000 or Multigigabit copper ports and 437W available to powered devices. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warranty as standard.
A Total number of MAC addresses of 32,000 on this model, the kind of ceiling that only becomes visible once a flat segment has grown.
48 POE+ Total 10/100/1000 or Multigigabit copper ports with 437W available to powered devices, so access points cameras and phones are fed from the same switch instead of from a parallel power estate.
256 Gbps on 48-port Gigabit Ethernet model published for C9300-48P-E as its switching capacity, confirmed against the current datasheet revision when the line is quoted.
Cisco StackWise-480 support on this model lets a multi switch closet be configured monitored and upgraded as a single device, which cuts the work in every change window.
Modules optics rails and power options are reviewed against C9300-48P-E before the quotation is issued, so the install crew is not blocked by a line nobody costed.
Bidding work that needs firm pricing and a written lead time before the end client is quoted
Standardising hardware across many customer sites and needing the same SKU available again
Replacing equipment that has reached end of support before an audit rather than after one
Adding capacity in defined increments as cabinets and rows fill up
As published by Cisco for this part number. Full electrical, port and performance specifications are issued with the quotation against the current datasheet revision.
| Product Description | Catalyst 9300 48-port PoE+, Network Essentials |
|---|---|
| Total 10/100/1000 or Multigigabit copper ports | 48 POE+ |
| Default AC power supply | 715W AC |
| Available PoE power | 437W |
| Cisco StackWise-480 | Yes |
| Cisco StackPower | Yes |
| Default power supply | PWR-C1-715WAC-P/2 |
| Switching capacity | 256 Gbps on 48-port Gigabit Ethernet model |
| Stacking bandwidth | 480 Gbps |
| Total number of MAC addresses | 32,000 |
| Total number of IPv4 routes (ARP plus learned routes) | 32,000 (24,000 direct routes and 8000 indirect routes) |
| IPv4 routing entries | 32,000 |
| IPv6 routing entries | 16,000 |
| Multicast routing scale | 8000 |
| QoS scale entries | 5120 |
| ACL scale entries | 5120 |
| Packet buffer per SKU | 16 MB buffer for 24- or 48-port Gigabit Ethernet models |
| FNF entries | 64,000 flow on 24- and 48-port Gigabit Ethernet models |
| DRAM | 8 GB |
| Flash | 16 GB |
| VLAN IDs | 4000 |
| Total Switched Virtual Interfaces (SVIs) | 2000 |
| Jumbo frames | 9198 bytes |
| Total routed ports per 9300 Series stack | 208 |
| Wireless bandwidth per switch | Up to 96 Gbps on 48-port Gigabit Ethernet model |
| Forwarding rate | 154.76 Mpps |
| Dimensions (H x W x D) | 1.73 x 17.5 x 17.5 Inches |
| Weight | 16.33 Pounds |
| Mean time between failures (hours) | 299,000 |
| Safety certifications | UL 60950-1 CAN/CSA-C222.2 No. 60950-1 EN 60950-1 IEC 60950-1 AS/NZS 60950.1 IEEE 802.3 |
| Part Number | C9300-48P-E |
|---|---|
| Brand | Cisco |
| Category | Cisco Catalyst 9300 |
| Product Condition | New factory sealed |
| Serial Traceability | Full serial list supplied before shipment |
| Warranty | 12 months replacement plus optional vendor support contract |
| Packaging | Original vendor carton with export grade outer |
| Lead Time | Confirmed in writing per line at quotation |
| Delivery | Worldwide courier or freight from Hong Kong |
Values are taken from each manufacturer specification. A blank means the manufacturer does not publish that attribute for that model.
| Attribute | C9300-48P-E | C9300-NM-2Y | C9300-NM-4G | C9300-NM-4M |
|---|---|---|---|---|
| Ports | 48 POE+ | - | - | - |
| PoE Power | 437W | - | - | - |
| Throughput | 256 Gbps on 48-port Gigabit Ethernet model | - | - | - |
| Stacking | Yes | - | - | - |
| Form Factor | 1.73 x 17.5 x 17.5 Inches | - | - | - |
| MAC Table | 32,000 | - | - | - |
| Product page | View C9300-48P-E | View C9300-NM-2Y | View C9300-NM-4G | View C9300-NM-4M |
Check C9300-48P-E character for character including any suffix. On this class of hardware a single trailing character commonly changes the software tier, the power option, or whether a bundle is included.
Confirm rack space, power feed, cabling and any uplink or accessory dependency before the order rather than on the day of installation.
Compare the devices this unit will feed against the 437W available, using realistic device draw with headroom rather than class maximums.
Photograph the sealed carton, reconcile the serial against the list supplied before shipment, then open and confirm the unit matches the label.
Power the unit, capture the software version and the port or drive inventory, and record it while the unit is still accessible.
Register the support contract under the end user name so the entitlement sits with the organisation that owns the outage.
Catalyst 9300 2 x 25G Network Module. It is supplied new factory sealed, with the serial list issued before shipment and 12 months replacement warrant
C9300-NM-4G is the support optional network modules for uplink ports of the Cisco Catalyst 9300 Series Switches. The default switch configuration does
C9300-NM-4M is the support optional network modules for uplink ports of the Cisco Catalyst 9300 Series Switches. The default switch configuration does
C9300-NM-4M= is the support optional network modules for uplink ports of the Cisco Catalyst 9300 Series Switches. The default switch configuration doe
C9300-NM-8X is the support optional network modules for uplink ports of the Cisco Catalyst 9300 Series Switches. The default switch configuration does
Cisco Catalyst 9300 Series is the next generation of the industry's most widely deployed stackable switching platform. Built for security, IoT, and th
Cisco Catalyst 9300 Series is the next generation of the industry's most widely deployed stackable switching platform. Built for security, IoT, and th
Cisco Catalyst 9300 Series is the next generation of the industry's most widely deployed stackable switching platform. Built for security, IoT, and th
Access, distribution and wireless supplied to one standard so every closet in every building behaves the same way.
Repeatable CPE and aggregation hardware supplied at the volume and consistency a managed service contract depends on.
Wireless projects are rarely stopped by the access point. They are stopped by a mount, a PoE class or a licence count that nobody confirmed before the order went out.
A cabinet is commissioned as a unit, so it should be supplied as one. Switches, optics, rails and power leads belong in the same consignment.
A support contract registered under a reseller name is of limited use to the organisation that owns the outage. Entitlement is written under the end user name.
Lecture theatres and the library could not carry the client counts actually present, while the work could only happen during vacations
The tender required a firm price and date at submission, months before any award, across a bill of materials of several hundred lines
Five decisions set the part number. Getting them in the right order prevents most of the changes that happen late in a project.
Wireless installs are rarely delayed by the access point. They are delayed by the mount, the power class or the cable that feeds it.
Refresh programmes fail on supply far more often than on design. This is the sequence that keeps a phased rollout on its dates.
Standard supply is new factory sealed in the original vendor carton. If a quotation offers another condition that is stated explicitly in writing before you commit.
Yes. Serials are issued before shipment so you can check them on the manufacturer portal while the goods are still with us.
Availability is confirmed in writing per line at quotation rather than as a project average, because one late line is what moves an installation date.
12 months replacement as standard. A vendor support contract is available separately and is registered under the end user name.
The manufacturer lists available poe power of 437W for this model. A PoE budget should be calculated from realistic device draw with headroom rather than from class maximums.
The published switching capacity is 256 Gbps on 48-port Gigabit Ethernet model. Full port and performance specifications are issued with the quotation against the current datasheet revision.
They are quoted as separate lines and reviewed against the chassis before the quotation is issued, so they reach site in the same consignment as the unit they belong to.
The manufacturer lists Cisco StackWise-480 support for this model. Stacking cables are a separate line and are quoted with the switches so a multi switch closet arrives complete.
The published Total number of MAC addresses is 32,000. Table ceilings usually only become visible once a flat segment has grown, so they are worth checking against the design rather than against today's estate.
Send the quantity and destination country. Availability and lead time come back in writing, with the serial list before shipment.