Project Case · Data Center

Hosting Provider Repeatable Node Build

Nodes were arriving without rails or caddies, so racking waited on a second consignment and the revenue date moved

Sealed stock allocated in one block for the Hosting Provider Repeatable Node Build programme

The same part numbers were held across batches so a node built this quarter is identical to one built two quarters ago

Client Background

A hosting provider adding compute capacity in fixed node increments as customer demand is signed

The Constraint That Mattered

Nodes were arriving without rails or caddies, so racking waited on a second consignment and the revenue date moved

Customer Pain Points

What Was Actually Going Wrong

  • Accessories were treated as an afterthought rather than part of the node
  • Drive and controller firmware combinations were not checked before despatch
  • Node specification drifted slightly between batches bought months apart
Our Solution

What We Did About It

One node specification was fixed against a single chassis generation and turned into a repeatable kit list that included rails, caddies, cable management and power leads.

  1. Step 1

    Node configuration fixed against one chassis generation and documented as a kit list

  2. Step 2

    Drive and controller combinations confirmed against the firmware level in production

  3. Step 3

    Nodes powered up and the drive and memory inventory captured before packing

  4. Step 4

    Kits released in node multiples as capacity was signed

Supply Chain Coordination

The same part numbers were held across batches so a node built this quarter is identical to one built two quarters ago

Quality Control

Every node was powered up, the firmware level reported and the installed inventory captured against the kit list before export packing

Final Result

Nodes that rack and power on the day they arrive

Customer Benefit

Capacity can be signed against a delivery date because the node build is a known quantity rather than an assembly exercise

Related Products

Hardware Supplied on This Programme

HPE

P02464-B21

HPE ProLiant DL380 Gen10 4210 2.2GHz 10-core 1P 32GB-R P408i-a 8SFF 800W PS Server, P02464-B21 S-ERVER. The published specification for P02464-B21 lis

HPE

P02466-B21

HPE ProLiant DL380 Gen10 6230 2.1GHz 20-core 1P 64GB-R P816i-a 8SFF 800W RPS Server S-ERVER. The published specification for P02466-B21 lists 64 GB of

HPE

P02467-B21

HPE ProLiant DL380 Gen10 4208 2.1GHz 8-core 1P 32GB-R P408i-a 24SFF 800W PS Server S-ERVER. The published specification for P02467-B21 lists 1. It is

HPE

K2R13A

HPE NAS StoreEasy 1450 Storages K2R13A - HP StoreEasy 1450 8TB SATA Strg. The published specification for K2R13A lists 8 TB Raw Internal SATA Included

HPE

K2R14A

HPE NAS StoreEasy 1450 Storages K2R14A - HP StoreEasy 1450 16TB SATA Strg. The published specification for K2R14A lists 16 TB Raw Internal SATA Includ

HPE

Q2R92A

Q2R92A is the HPE StoreEasy 1460 8TB SATA Storage. HPE StoreEasy 1460 Storage products are storage solutions that deliver multi-protocol file serving

Solutions

Programmes Behind This Case

Server and Storage Supply

A server order is judged on whether the node goes in on the booked date, which depends almost entirely on the parts that are not the server.

Industries

Sector Page

Data Center

Top of rack switching, compute and storage delivered in the phased increments a cabinet build actually consumes.

FAQ

Questions About This Project

Can You Name the Client

No. Client identities are described by sector and scale rather than by name, which is a condition of most of the programmes we work on.

Could This Approach Work for a Smaller Estate

Yes. The mechanics of one standard, per site kits and a serial list per site scale down as readily as they scale up.

How Long Does a Programme Like This Take

It is set by the change windows the business grants rather than by supply. That is why the wave plan is built against booked windows rather than an ideal calendar.

What Would the First Conversation Cover

The estate audit. Until the deployed part numbers and support status are in one list, scope is an estimate.

Describe an Estate and We Will Describe the Programme

Site count, current hardware and the change windows you can get. That is enough for a first scope.