Magnetic components and complete transformers since 2009 +86-755-61124460 [email protected] Facebook  LinkedIn

Manufacturing Process Guide

How a magnetic component part goes from your drawing to a packed carton at CB Magnetics.

Six stages, all inside one plant in Zengcheng District Guangzhou. The route is the same whether the part is a catalogue geometry running on an existing tool or a new tool cut for your drawing.

1 Drawing Review

Your drawing or part number is checked against tooling that already exists. This step is free and it regularly removes the need for a new tool altogether.

2 Tool Design

The mould is designed at the CAD station. Section split, gate position, pin retention and draft are decided here, which is where most later problems are avoided.

Mould design at the CAD station at CB Magnetics

3 Tool Making

Steel is cut on wire cut EDM and CNC machines in our own tool room.

Wire cut EDM and CNC machines in the CB Magnetics tool room

4 Moulding And Assembly

Bodies are moulded in the specified thermoset or thermoplastic, terminals are inserted, and where the order is for a finished component the core is fitted and the part is wound on the assembly line.

Assembly and winding line at CB Magnetics

5 Measurement And Test

Moulded parts are checked against the drawing in the measuring room using a profile projector, microscope and gauges. Wound parts go to the electrical test bench for inductance and resistance with an LCR meter and Kelvin clips, plus winding and insulation checks.

Measuring room with profile projector and gauges at CB Magnetics

6 Packing And Shipment

Packed to the method stated on the part page, labelled and held in the finished goods warehouse until collection.

See the full facility page

Need this applied to a specific part? Ask an engineer on WhatsApp or send an email.

More From The Knowledge Center

Questions On This Topic

Do you make your own tooling

Yes, in our own tool room on wire cut EDM and CNC machines.

How are parts inspected

Against the drawing in a dedicated measuring room rather than against a golden sample.

Can I audit the process

Yes. Visits and audits at the Zengcheng plant can be arranged.

Turn This Into A Part Number

Send the constraint you are working against and you will get a part number or a tooling answer back.

WhatsAppEmail