Magnetic components and complete transformers since 2009 +86-755-61124460 [email protected] Facebook  LinkedIn

Facility Tooling And Quality

Mould design tool making injection moulding assembly measurement and packing, in one plant in Zengcheng District Guangzhou. Every photograph on this page is our own.

ISO 9001:2015ISO 14001:2015 ISO 45001:2018RoHS compliant

From Drawing To Packed Carton

Six stages. The same route runs whether the part is a catalogue geometry or a new tool.

01

Drawing review

Your drawing or part number is checked against tooling we already own before anything is quoted.

02

Tool design

The mould is designed at the CAD station, with the section split pin positions and gate decided up front.

03

Tool making

Steel is cut on the wire cut EDM and CNC machines in our own tool room.

04

Injection moulding

Bodies are moulded in the specified thermoset or thermoplastic.

05

Assembly and winding

Terminals are inserted, and where the order is for a finished component the core is fitted and the part is wound.

06

Test and packing

Dimensional check in the measuring room, electrical check on the test bench, then packing.

Inside The Plant

Tool room, moulding, assembly, measuring room, test benches and finished goods.

Mould design station. Every bobbin base and case starts as a tool drawing before any steel is cut.
Mould design station. Every bobbin base and case starts as a tool drawing before any steel is cut.
Wire cut EDM and CNC machines in the tool room where the mould steel is produced.
Wire cut EDM and CNC machines in the tool room where the mould steel is produced.
Assembly and winding line. Operators work in caps and coats at fixed benches.
Assembly and winding line. Operators work in caps and coats at fixed benches.
Second assembly line running components down a bench conveyor.
Second assembly line running components down a bench conveyor.
Measuring room with profile projector microscope and gauges used to check moulded parts against the drawing.
Measuring room with profile projector microscope and gauges used to check moulded parts against the drawing.
Electrical test bench. LCR meter with Kelvin clips for inductance and resistance checks.
Electrical test bench. LCR meter with Kelvin clips for inductance and resistance checks.
Second test set used for winding and insulation checks on finished components.
Second test set used for winding and insulation checks on finished components.
Finished goods warehouse. Cartons packed and labelled ready for collection.
Finished goods warehouse. Cartons packed and labelled ready for collection.
The plant, with the company name on the building.
The plant, with the company name on the building.

Certificates

Issued to CB Technology Industrial Co., Limited. Click a certificate to open the PDF.

ISO 9001:2015 certificate held by CB Technology Industrial Co., Limited
ISO 9001:2015
Quality management system certificate issued to CB Technology Industrial Co., Limited.
Download PDF
ISO 14001:2015 certificate held by CB Technology Industrial Co., Limited
ISO 14001:2015
Environmental management system certificate.
Download PDF
ISO 45001:2018 certificate held by CB Technology Industrial Co., Limited
ISO 45001:2018
Occupational health and safety management system certificate.
Download PDF
Certificate scans are reproduced from the originals. If your quality department needs the current signed copy or the scope wording in full, ask and it will be sent directly.

Capability Summary

  • Mould design and tool making in-house, including wire cut EDM and CNC machining
  • Plastic injection moulding in thermoset and thermoplastic materials
  • Terminal insertion and component assembly lines
  • Toroid and bobbin winding for finished inductors and transformers
  • Dimensional inspection in a dedicated measuring room
  • Electrical test including inductance resistance and insulation checks

What We Do Not Claim

Production capacity figures, export country counts and customer names are not published on this site because we would rather state nothing than state a number we cannot show you. If your audit needs those figures, ask and they will be sent with supporting documents.

Request audit information

Questions About The Plant And Quality

Can I visit the factory

Yes. Send a date on WhatsApp or by email and a visit to the Zengcheng plant can be arranged.

What quality certifications do you hold

ISO 9001:2015 for quality, ISO 14001:2015 for environment and ISO 45001:2018 for occupational health and safety. All three certificates are shown above and can be downloaded as PDF.

How are moulded parts checked

Against the drawing in the measuring room using a profile projector microscope and gauges, rather than against a golden sample.

How are wound components tested

On the electrical test bench. Inductance and resistance are measured with an LCR meter and Kelvin clips, and winding and insulation checks are run on a second test set.

Do you make your own tooling

Yes. Mould design and tool making are in-house, on the wire cut EDM and CNC machines shown above.

Are your products RoHS compliant

Yes. All products from CB Magnetics are RoHS compliant.

Arrange A Visit Or An Audit

The Zengcheng plant takes customer visits and audits. Send a date and what you need to see.

WhatsAppEmail