ArtChems
Caustic Soda Supply Solutions

Caustic Soda Supply Solutions

Buying an industrial chemical is a procurement problem as much as a technical one. These pages set out how we handle the volume the packaging and the export side so that the material arrives when your plan says it should.

Across Every Stage

What We Take Responsibility For

  • Specification — chemical limits fixed in writing before production
  • Sampling — samples sent so you can check the material before the bulk order
  • Production — every batch to GB 209-2006 industrial grade
  • Inspection — SGS CIQ or INTERTEK at the point you choose
  • Packing — 25 kg bags jumbo bags and your own printed labels
  • Loading — palletised or floor stacked and squared off in the container
  • Logistics — sea or railway routing depending on availability
  • After delivery — a named contact for the next cycle
Production
ProductionFlake product bagged and sealed on our own line
Loading
LoadingCargo squared off inside the container before sealing

FAQ

Supply and Logistics Questions

Answers to the questions buyers ask us most often before placing a first order

Flakes ship within 7 to 10 days after order confirmation and pearls within 15 to 20 days. Inspection bookings and peak season can move these windows so we confirm the date when we quote.

Yes. Tell us the forwarder and the cut off dates and we will work to their schedule.

Yes. Request a sample with the grade you are considering and we will confirm what we can send and how.

Put Your Requirement In Front Of Us

Put Your Requirement In Front Of Us

Grade volume packaging destination. Four lines are enough for us to come back with a plan.

WhatsApp Email