Oil Gas and Chemical Plants

Attach alcohol screening to the identity record at a permit controlled entrance, with terminals holding 10000 faces and 20000 test records.

ALCOKSON alcohol screening terminal with touchscreen for controlled plant entry
Industries

What Makes This Setting Different

A wall mounted alcohol screening terminal is the right tool when a person arrives at a controlled access point and the decision to allow entry must be made quickly and recorded. The ALC-605, ALC-607 and ALC-608 terminals use fuel cell sensors to detect breath alcohol, measure body temperature, and recognise faces. They are designed to integrate with existing permit to work systems by linking the screening result to the same identity record used for access control.

Pain points we hear

  • Screening results are recorded in a separate notebook, making it hard to link a test to a specific person or shift
  • Contractors and visitors outnumber staff, increasing the risk of unverified entry after screening
  • A terminal that does not store a record of who was tested and when cannot support an incident investigation
  • A system that cannot verify identity may allow someone else to take a test on behalf of the person entering
  • A slow or unresponsive terminal causes delays at high-traffic access points

What Buyers Need

  • A terminal that stores 10000 registered faces and 20000 test records for audit and investigation
  • Hardware that responds in 5 seconds and works reliably in a 10 C to 50 C operating range
  • A system that links the screening result to the same identity record used for access control
  • A device that can detect if a person is wearing a mask, preventing bypass of the test
  • A terminal that runs on 12V DC or 100V-240V AC to suit different site power systems

Typical Scenarios

  • Permit to work gate at an oil and gas platform where contractors must be screened before entry
  • Chemical plant turnaround with a contractor crew arriving on one shift
  • Entry checkpoint at a refinery where visitors must be verified and tested before access
  • Controlled access point during a safety audit where all personnel must be logged
  • Remote site with no on-site staff, where screening must be automated and self-verified
Stage by Stage

How the Programme Runs

1

Integrate with access control

Problem A screening result that is not linked to a person’s identity record cannot be used to verify compliance

How we solve it The terminal stores face data and test records together, so the result is tied to the individual at the time of entry

2

Configure alarm threshold

Problem A fixed alarm point does not match the legal or policy limit in every site or country

How we solve it The alarm point is set at the service centre to 0.02%, 0.05%, or 0.08% before shipment, based on the destination site’s policy

3

Deploy at access point

Problem A terminal that fails in high humidity or temperature extremes cannot be trusted during a shift

How we solve it The terminal operates in 10 C to 50 C and withstands up to 95% humidity, suitable for outdoor and industrial environments

Delivery

What You Get When You Order

  • Units are configured for the destination site’s alarm threshold before shipment
  • Face and test data are preloaded based on the site’s access list, if provided
  • Calibration and recalibration intervals are confirmed in writing at order time
FAQ

Questions Buyers Ask Before Ordering

Which terminal should I use for a high-traffic site with contractors?
The ALC-605 or ALC-608 if you need mask detection and facial recognition. The ALC-607 is available for custom configurations upon enquiry.
How many faces and test records can the terminal store?
The terminal stores 10000 registered faces and 20000 test records, which is sufficient for a large site with frequent contractor turnover.
Can the alarm point be changed after delivery?
It is set at the service centre before shipment. Contact us with the new threshold and we will reconfigure the unit before dispatch.
What power supply does the terminal need?
It runs on 12V DC or 100V-240V AC, suitable for both industrial and standard building power systems.
Is the ALC-607 different from the ALC-605 or ALC-608?
The ALC-607 has the same core functions but its full specification is issued per enquiry, based on site requirements.
What is the lead time and minimum order?
Both are confirmed per order because they depend on alarm point configuration and any branding. Ask when you request a quote.

Put a screening programme in place for oil gas and chemical plants

Send the number of gates or vehicles, the shift pattern and the market you operate in. We will name the models and the configuration and put the figures in writing.