Double-sided LED flag sign
Build Study

A Double Sided LED Flag Projecting Sign

The venue is read by people walking along the street rather than standing in front of it, so a flat fascia sign would have been invisible until the customer had already passed.

Project Challenge

The Problem On The Table

The venue is read by people walking along the street rather than standing in front of it, so a flat fascia sign would have been invisible until the customer had already passed.

Customer Pain Points

  • Two faces have to be lit evenly from one internal LED layout
  • Projecting signs usually need permission and a fixed projection dimension
  • Frame, acrylic and LED are built separately, which lengthens production to 7 to 10 days
Our Solution

How It Was Built

A metal frame painted to a supplied Pantone or RAL code carries double-sided translucent acrylic with waterproof LED inside. The unit mounts on a wall foot and ships with all installing accessories and a transformer, with maintenance access designed in.

Full specification for Double-sided LED Flag Sign 05

Manufacturing Process

Four Stages On The Floor

Frame

Metal frame fabricated and painted to the supplied colour code.

Faces

Translucent acrylic on both sides so the sign reads from either direction.

Illumination

Waterproof LED laid out for two faces rather than one.

Mounting

Wall foot fixing with screws and transformer supplied; maintenance access planned at design stage.

Supply Chain And Quality Control

What Happens Before It Ships

Joints are dressed before finishing, illuminated builds are wired and lit before the back closes, and polished and acrylic faces keep their protective film for the whole journey. Formal QC documentation is TBC and is not claimed here.

Double-sided LED flag sign
Double-sided LED flag sign
Double-sided LED flag sign 05 — additional workshop photograph of the finished letter
Double-sided LED flag sign 05 — additional workshop photograph of the finished letter
Final Result

What The Buyer Received

A projecting sign legible from both directions along the street, with easy maintenance and a documented 7 to 10 day production window.

Customer Benefit

Why It Matters Commercially

The projection dimension and the approval question are raised before the bracket is built, which is the part that cannot be changed afterwards.

Related Products

Comparable Builds In The Catalogue

Questions

Double Sided LED Flag Sign Build Questions

Which catalogue product is this build?

Double-sided LED Flag Sign 05, in the other led signs category. The full specification is on its own product page.

Is this a named client project?

No. We do not publish client names or invented project narratives. This describes how the product itself is made and what constrains it, using our own production specification.

Can this build be reproduced exactly?

Yes, from your own artwork. The projection dimension and the approval question are raised before the bracket is built, which is the part that cannot be changed afterwards.

What is the lead time on a build like this?

7 to 10 days in production, plus roughly 4 to 5 days on DHL or UPS express door to door.

Build Something Like This

Send your own artwork and we will quote the same construction at your letter height, with the production window and the constraints stated up front.