Risheng PX logo
Power Utilities And Substations served by Risheng

Porcelain Insulators For Power Utilities And Substations

A line section or substation that keeps flashing over after every wet season

Pain points

What Gets In The Way

  • A line section or substation that keeps flashing over after every wet season
  • Wash programmes that cost more over a few years than re-insulating would
  • Replacement parts for patterns that are no longer stocked locally
  • Faults that cannot be located from the ground on a porcelain string
Requirements

What This Sector Needs From A Supplier

  • Creepage selected from the measured site pollution class
  • Long creepage options within the same mounting envelope
  • Patterns held across IEC, DIN, EN, ANSI, AS, GB and GOST
  • Toughened glass discs that show a puncture visibly
Typical scenarios

Where These Parts End Up

  • Substation transformers in coastal or industrial air
  • Distribution feeders through cement, steel and chemical corridors
  • Transmission strings in desert and semi-arid terrain
  • Pole transformer protection with drop-out fuse cutouts
Delivery

How We Deliver

  • Products in service in more than 20 countries' power systems
  • Export packing to your shipping route
  • One year quality guarantee period
  • Technical support on selection before and after the order
Process

From Enquiry To Delivery

Describe the site conditions, including salt, dust and industrial fallout

We recommend a creepage class and matching pattern

Drawing issued for approval, with alternatives where the envelope is fixed

Production, routine testing and shipment to the project

Questions

Power Utilities And Substations Questions

How do I decide how much creepage a site needs?
From the pollution severity, not the voltage alone. Salt fog, cement dust and industrial fallout form a conductive film, and the creepage has to keep the leakage current from bridging between washes.
Can I get more creepage without changing the mounting?
Often yes. The CD525 bushing, for example, adds 85mm of creepage over the 440mm version while keeping a body the terminal board already accepts.
Do you supply complete fuse cutouts?
Yes, the RW11-10 open frame drop-out cutouts at 100A and 200A, as well as the porcelain bodies across fifteen figure numbers.
Which markets do you already serve?
Customers in the United States, Thailand, Singapore, Vietnam, Cambodia, Sri Lanka, Australia, Nigeria, Indonesia, Kenya, Brazil, South Africa, Uzbekistan and other countries.

Supplying Power Utilities And Substations

Send the drawing, the standard you work to and the quantity. We reply within 24 hours with a pattern confirmation and a date.