Installation And Operator Training
A converting machine only earns money once your own operators can set it. Every machine leaves our factory with its settings recorded against the material we ran, and English operation and technical manuals so the knowledge stays in your plant.
Stage By Stage From Enquiry To Production
Each stage below names the problem it exists to prevent, because that is what decides whether the machine works in your plant rather than ours.
Pre-Arrival
Problem: Foundations, power and air are often prepared too late.
How we solve it: Layout drawings, power ratings and air pressure requirements are sent before shipment.
Installation
Problem: Machines damaged or misaligned during positioning lose accuracy from day one.
How we solve it: We supply positioning and levelling instructions and support installation remotely or on site.
Setting
Problem: Operators guess tension, temperature and pressure on a machine they have never seen.
How we solve it: Factory run-off settings are recorded per material and supplied with the machine.
Training
Problem: Knowledge held by one operator leaves when that operator does.
How we solve it: English manuals plus video support cover setting, changeover and routine maintenance for the whole team.
Machines Involved In This Solution

Medical Bed Cover Folding Machine
Ultrasonic Bonding And Three-Way Folding For Disposable Medical Bed Covers
Model AQ-B(2400)
Wet Wipes Making Machine
Six Feeding Systems Wetting Folding Cutting And Counting In One Line
Model AQ-6F
Pocket Filter Bag Making Machine
Ultrasonic Pocket Filter Bag Production Driven By Six Servo Motors
Model AQ-(600-1000)Installation And Operator Training Questions
Do you quote the whole line or single machines?
Both. We sell single machines for an existing line and we plan complete lines from jumbo roll to sealed carton.
What information do you need to quote?
Finished product drawing or dimensions, fabric type and gsm, output target, pack format, and your voltage and frequency.
How long does the whole process take?
Machine delivery runs from about 15 days for sealing and labeling equipment to about 45 days for wide bed sheet and spa lines, after order confirmation.
Can you support installation and training?
Yes, remotely through WhatsApp video or on site by arrangement, with English manuals and recorded run-off settings supplied with the machine.
Installation And Operator Training
Send us the product you want to produce and the constraints you are working with. We reply with a plan, not a catalogue.
