Client Background
An interactive audio installation acting as a time capsule for the sounds of Singapore, built as five large gazing globes that would serve as a remembrance of everyday intangible heritage.
Project Details
- Location
- Singapore
- Product range
- Large Steel Balls
Customer Pain Points
- Five identical large spheres had to match in form and finish
- The globes had to be fixed permanently in a public landscape
- Audio equipment had to be accommodated within the installation
Our Solution
Five large stainless steel gazing globes were made from ∅2.5 metre large steel balls, formed in 2mm durable AISI 304 stainless steel.
Manufacturing Process
A tube base was welded to the bottom of each globe for installation below ground level.
Supply Chain Coordination
The five globes were produced as one batch so the finish matched across the set.
Quality Control
Incoming material
Alloy and sheet thickness are checked against the order before any blank is cut.
Forming check
Diameter and wall are measured after pressing, spinning or water pressuring.
Weld and grind
The equator weld is inspected, then welds and burrs are ground off before finishing.
Surface inspection
Every piece is inspected for scratches, dents and polish consistency under light.
Packing
Protective packing is built around the diameter and weight, and photographs are sent before dispatch.
Final Result
The installation's audio recordings feature familiar everyday sounds, from suburban traffic and MRT trains to chatter in wet markets and coffee shops.
Customer Benefit
One production run held the surface finish consistent across all five spheres in a permanent public setting.
Project Gallery







Have a Project Like This
Send the drawing or the concept. We will confirm the forming route, the segmentation if any, and the freight mode before you commit.