DLCNC logo of Chengdu Jindali TechnologyPCB Drilling and Routing
Solution

Spare Parts and Maintenance

Equipment is the first of the four factors that affect hole location accuracy. Regular check and maintenance lets problems be detected and wiped out as early as possible which is what keeps working accuracy.

PCB drill bits loaded in a tool cassette ready for a drilling machine

From Requirement Analysis to Final Delivery

Eight stages. Each one exists because a project has gone wrong at that point before.

Daily Maintenance

Ten items before and after the machine runs each day covering appearance spindle and tool cassette tooling computer electric cabin lubricant oil cooling liquid air pipe tooling box and shelf.

First Level Weekly

Nine items done by the night shift team taking about one hour with the power cut off first. Cleaning inside and outside lubricating the worktable cleaning the collet and sorting the computer cables.

Second Level Monthly

Ten items done by the day shift team with repair staff included taking about one and a half hours. It adds the guide rail cover removal cleaning and lubrication the limit switch check and the electric cabin fan filter.

Spare Part Stock

Drill bits milling cutters collets ball screws guide rails with slide blocks inverters spindles bearings armature disc springs and PLC cards.

Service Stations

Three service stations located in South China East China and North China respond to problems raised in customer factories and carry the regular machine maintenance.

Overseas Support

Partners abroad take care of after sale service outside China.

Consumable Replenishment

Drill bits and milling cutters are supplied in all diameters and specifications against your part list.

Accuracy Recovery

Where accuracy has drifted the four factor check is applied. Equipment technics parameters tool status and operator skill in that order.

Questions and Answers

Spare Parts and Maintenance FAQ

How often should the machine be maintained
Daily before and after running weekly at first level and monthly at second level. The full item list is published in the maintenance guideline.
Who carries out the weekly maintenance
The night shift team on duty in turn taking about one hour with the power cut off first.
Does a ball screw need recalibration
Ball screw driven tables need recalibration about every year. Air driven tables have lower abrasion but higher energy consumption from the air supply.
Can I get spares for a machine bought years ago
Send the machine model and the part specification. Standard components come from THK Hiwin Delta and Westwind and equivalent brands.
Next Step

Start With the Requirement Not the Catalogue

Send the numbers you have to hit. Board format hole or slot geometry cycle time and the environment the machine will live in.

CAD and drawing files are accepted on request through WhatsApp or email. No form to fill in.