PCB Drilling Machine Maintenance Guideline

This maintenance guideline covers the PCB board drilling machine as a CNC process centre. It also applies to the routing machine.

Published 2023-09-11 by Chengdu Jindali Technology Co., Ltd

D22 PCB drilling machine covered by the DLCNC maintenance schedule

Daily Maintenance

Carried out before and after the machine runs each day. Ten items are checked and the machine is not released to production until each one is clear.

First Level Maintenance Weekly

Carried out by the night shift team with the teams on duty in turn. Duration is about one hour. Cut off the power supply first and then follow the steps.

Second Level Maintenance Monthly

Carried out by the day shift team with the teams on duty in turn and repair staff included. Cut off the power supply first then follow the steps and make the spare parts list. Duration is about one and a half hours.

Daily Maintenance Items

NoMaintenance PartMaintenance Requirement
1AppearanceAll in clean condition. Deburr if not smooth
2Spindle and tool cassetteIn clean condition. Run the spindle at lower speed for at least 10 minutes
3Tool and tool setAll required specifications in place stainless and screws tight
4ComputerAppearance clean documents sorted recycling station cleared. Document names include title version time and operator
5Electric cabinClean and free of dust
6Lubricant oilOil can level checked and the lubricant device in good condition
7Cooling liquidNo leak and no blockage
8Air pipe and air gunNo leak and flowing freely
9Tooling box and tooling tableInside and outside clean tooling in place and no rust
10ShelfClean sorted and no rust

First Level Weekly Items

NoMaintenance PartMaintenance Requirement
1AppearanceClean inside and outside no rust clean the worktable check the flatness deburr and lubricate
2Spindle and tool cassetteClean the cassette clean the spindle with a soft cloth clean and lubricate the collet
3Tool and tool protectionClean sorted no rust and screws tight
4ComputerClean the computer and sort the cables
5Electric cabinClean and free of dust
6Lubricant oilOil can level checked and the lubricant device in good condition
7Cooling liquidNo leak and no blockage
8Tooling box and tooling tableInside and outside clean tooling in place and no rust
9ShelfClean sorted and no rust

Second Level Monthly Items

NoMaintenance PartMaintenance Requirement
1AppearanceClean the machine and top cover no rust clean the worktable check the flatness deburr and lubricate
2Spindle and cassetteClean the cassette clean the spindle with a soft cloth clean and lubricate the collet
3Guide railRemove the guide rail cover clean the piling near the rail and lubricate. Check the limit switch is in working condition
4Tool and tool protectionClean sorted no rust and screws tight
5ComputerClean the computer sort the cables and update the antivirus software
6Electric cabinClean and free of dust. Clean the filter of the back door fan
7Lubricant oilOil can level checked and the lubricant device in good condition
8Cooling liquidNo leak and no blockage
9Tooling box and tooling tableInside and outside clean tooling in place and no rust
10ShelfClean sorted and no rust
Questions and Answers

Questions On This Guide

Does this schedule apply to routing machines
Yes. The PCB board drilling machine maintenance schedule also applies to the routing machine.
Why run the spindle at low speed for ten minutes
It is part of the daily spindle and tool cassette check and is done with the machine in a clean condition before production.
Why is the power cut before weekly and monthly work
Both the first level and second level schedules start by cutting off the power supply before any of the steps are carried out.
Next Step

Have a Question This Guide Did Not Answer

Send it to an engineer. Answers come from the people who build and commission the machines.

CAD and drawing files are accepted on request through WhatsApp or email. No form to fill in.