Turnkey Energy Storage Project Supply
Home/Solutions/Turnkey Energy Storage Project Supply

Turnkey Energy Storage Project Supply

Load study, system sizing, container build, shipping and commissioning in one contract.

The Route

Turnkey Energy Storage Project Supply

Most storage projects fail on the interfaces, not the batteries: who sizes the PV, who owns the grid connection, who commissions the container. This is the sequence we run so those questions have answers before the order is placed.

  • Standard container builds from 1.03 MWh to 2.5 MWh, plus trailer builds from 250 kWh
  • PV panel model, quantity, panel size and floor space quoted with the system
  • Big project delivery experience on China Mobile and China Tower programmes
  • Payment by TT or LC at sight depending on the market
Turnkey Energy Storage Project Supply delivered by ZP LITHIUM
Load study, system sizing, container build, shipping and commissioning in one contract.
Step By Step

The Eight Stages Of This Route

Each stage has an owner and an output, so you know what is meant to exist before the next one starts.

  • Load and tariff study

    Site consumption curve and tariff structure decide whether storage pays and at what size.

  • Generation assessment

    PV yield, sunshine hours and a 25% photovoltaic loss are built into the sizing, not added later.

  • System configuration

    Cluster voltage, container format and cooling are set against the site and the climate.

  • Civil and connection scope

    Slab, cable route and connection point are agreed with the local contractor before production starts.

  • Factory integration and test

    Clusters, air conditioning and interfaces are installed and tested in Wuxi.

  • Documentation and shipping

    MSDS, UN38.3 and market-specific certification are prepared with the shipping documents.

  • Site commissioning

    The container is connected, parameters set and output verified on site.

  • Handover and warranty

    Operating procedures are handed over under the two year product warranty.

ZP LITHIUM production supporting Turnkey Energy Storage Project Supply
Production and integration happen on one site in Wuxi, which keeps the interfaces inside one company.
Finished systems prepared for export shipment
Documentation is prepared alongside production, not after it.
Answers

Questions About This Route

How long does this route take?

Production is 60 days on a first order and 30 days from the second. Study, configuration and documentation run alongside rather than after.

Who owns the interfaces?

We produce the cell, build the pack or container and prepare the documentation, so the interfaces stay inside one company.

What commercial terms apply?

Minimum order normally starts from one 40 HC container. Payment is TT or LC at sight depending on the market.

Is sole agency available on this route?

Yes, depending on your project plan. We provide sole agency based on your market plan and operation.

What warranty covers the delivered system?

Two years warranty on lithium battery products, and 5 years or 12,000 km on the EV traction range.

Start This Route With One Message

Tell us the application, the scale and the destination market. We will tell you which stage we can start at and what we need from you.