TJ-Teck mould workshop in Chang'an, Dongguan with CNC milling machines and mould bases in process
Row of CNC machining centres cutting mould cores and cavities at the TJ-Teck tool shop
Injection moulding machine running a trial shot on a TJ-Teck production tool

TJ-Teck · Mold . Tomorrow . Together

Injection moulds and moulded parts, built for small and mid-sized projects

Small and mid-sized injection tooling projects, quoted in 1-3 working days and built to European and American shop standards.

Chang'an Town, Dongguan, in the Greater Bay Area. Working towards buyers in Europe and America since 2017.

Founded
2017, Chang'an Town, Dongguan
Quotation
Back in 1-3 working days
Mould types
8 quoted as standard
Markets
Europe and America

What we make

Seven reference parts, seven different tooling problems

A straight-pull cover, a housing with slides, a cap that needs an unscrewing core, a transparent part that needs mirror-polished steel, and an assembly where three tools have to agree with each other.

Tooling

Eight mould types, quoted as standard

Which mould type your part needs is decided by two things: whether it has a moulded thread or an undercut, and how many parts a year you actually buy. Everything after that is a cost conversation.

  • Standard Mold
  • Prototype Mold
  • Reversed Mold
  • Multi-cavity Mold
  • Unscrewing Mold
  • Hot runner Mold
  • 2K Over Mold
  • 2K Rotational Mold
Injection mould with orange top clamping plate and ejector mechanism assembled for trial

How a project runs

From your CAD file to a crated mould

Six steps, each with a document attached to it, so you always know what has been decided and what is still open.

01

Send data

2D and 3D data, or a simple sketch if the design is not frozen. Tell us the annual volume; it decides more of the price than anything else.

02

Quotation in 1-3 days

Written against named choices: mould type, steel grade, mould base, hot runner and component brands.

03

DFM report

Fourteen checks on the model, from de-molding direction to markings and graining, agreed with you before steel is cut.

04

Simulation where it earns it

Gate position, fill pattern, air traps and clamping force verified on screen rather than on the first trial.

05

Mould design release

3D mould model and 2D construction set released for your review, with the shrink factors used stated.

06

Build, trial, ship

Tool built, trialled and measured against your drawing, then crated for export or kept running for part supply.

Inside the tool shop

Moulds built and fitted in Chang'an, Dongguan

Cavity and core work, bench fitting, first trial and export crating, photographed in the shop rather than borrowed from a catalogue.

Common questions about working with TJ-Teck

How quickly can TJ-Teck quote a new mould?

1-3 working days from receiving 2D and 3D data, or a sketch if the design is not frozen yet.

What size of project does TJ-Teck take on?

Small and mid-sized injection tooling projects. The company describes itself as a middle-sized tool shop and works to keep those projects reliable and flexible.

Which component and hot runner brands can be specified?

Mould bases and components from LKM, Hasco, DME, Meusburger, Progress, Misumi, Cumsa, Staubli, AHP Merkle, HPS, Parker and HEB; hot runners from HRS, Synventive, Husky, Incoe, Mold Master, YUDO, Mastip, Ewikon, Runipsys and DME.

Where is TJ-Teck located?

Room 102, Building No.1, JiangNan No.2 Street, XiaGang Village, Chang'an Town, 523873, Dongguan City, Guangdong, PRC, in the Greater Bay Area.

Does TJ-Teck supply moulded parts as well as moulds?

Yes. Tell us whether you want the tool shipped to your plant or the parts supplied, and the quotation is written for that scope.

Send your 3D data and the annual volume

That is enough for a quotation in 1-3 working days, with the mould type, steel grade and component brands written on it.