Dongguan Viboo · Dongguan, China
Averguard logo Request A Quote
Solution

Screening Checkpoint Design and Build

Most checkpoint problems are layout problems wearing a detection costume. Before choosing a gate, the questions worth answering are how many people arrive per minute, what happens when one alarms, and where the secondary check physically takes place.

Stage by stage, and what usually goes wrong at each

Requirement

Buyers usually start from a product category rather than a throughput figure, which leads to over-specified gates and under-specified lanes.

We ask for the arrival rate, the entrance dimensions and what you actually need to exclude, then work backwards to the equipment.

Lane Layout

An alarm with nowhere to send the person turns a 1,200 person per hour gate into a 200 person per hour queue.

We plan the secondary check position and the wand that supports it, so a gate alarm has somewhere to go.

Equipment Selection

Zone counts, tunnel sizes and penetration figures are hard to compare between suppliers.

We quote the specific model with its published figures, and say plainly where a cheaper model would do the same job.

Compliance

Radiation figures, certification references and import rules differ by market and stall a project late.

We confirm what documentation the factory can actually supply for your destination before you place the order.

Installation

Floor loading, access width and power capacity are usually discovered on delivery day.

We check building drawings against unit weight, packed dimensions and power draw first.

Commissioning

A gate set to factory defaults alarms on everything and gets turned down until it detects nothing.

Sensitivity is set per zone against the items you genuinely need to pass, and the settings are locked where the model allows.

Operator Training

Screener performance varies between shifts and cannot be measured.

We specify models with Threat Image Projection where competence must be evidenced, and supply training and testing aids.

Service

A checkpoint with one gate has no redundancy when that gate fails.

Spare parts are listed with the order, and field service technicians cover emergency repair and routine maintenance.

Screening Checkpoint Design and Build FAQ

Where do most checkpoint designs go wrong

In the alarm handling. Sites specify a high-throughput gate and then have no defined place to take the people it alarms on, so the queue forms behind the secondary check instead.

Should we buy the highest zone count available

Only if you need that resolution. More zones tell you more precisely where the item is; they do not detect more. We will say when a lower count is the right answer.

How long does commissioning take

It depends on how many items you need the gate to pass. Send us your exclusion list and we will give you a realistic estimate.

Can you supply a complete checkpoint rather than machines

Yes. Send the lane layout and throughput and we will propose gate, scanner, wand and training as one set.

Do you handle import and radiation approvals

We confirm what the factory can document. The approval itself is between you and your national regulator, and we will not pretend otherwise.

Start with the requirement, not the catalogue

Send what you are trying to achieve. We will work backwards to the equipment and tell you what it will and will not do.