Precision CNC Parts · Brass · Aluminum · Stainless Steel · Tight Tolerances Available [email protected] +86 13266088686
Row of precision grinding and machining equipment in a production workshop
Who We Serve

Mechanical and Equipment Builders

Builders and maintainers of machines and custom assemblies who need made-to-drawing functional parts in ones and twos.

Pain Points

What Gets In The Way

These are the four problems this group of customers arrives with most often.

A single part stops the build

Everything is on the bench waiting for one shaft or one housing.

Obsolete components

The original supplier is gone and no drawing came with the machine.

Production shops will not quote one piece

The quantity is too small to interest anyone set up for volume.

Tolerance treated as optional

The part arrives close enough to look right and wrong enough not to fit.

How We Work

How GRACTS Handles It

  • Minimum order quantity is 1 piece, so a single replacement is a normal order
  • Parts are made to the drawing you supply, including a drawing you measure yourself
  • ±0.05 mm as standard and ±0.01 mm where the fit demands it
  • Rush production in 3–5 business days when the machine is down
Row of precision grinding and machining equipment in a production workshop
Delivery

What You Can Count On

Minimum order quantity1 piece
Volume pricing from100 pieces
Standard lead time7–10 business days
Rush lead time3–5 business days
Quote responseWithin 24 hours
Standard tolerance±0.05 mm, tight tolerance to ±0.01 mm
General tolerance standardISO 2768-m
Accepted filesSTEP, IGES, DXF, PDF
CommunicationDirect with the GRACTS team, no middlemen
FAQ

Mechanical and Equipment Builders Questions

Can you make one replacement part?

Yes. The minimum order quantity is 1 piece and single orders are accepted.

I have no drawing, only the broken part. What then?

Supply dimensions and material, or a dimensioned sketch. We will tell you what else is needed before quoting.

How fast can an urgent part be made?

Standard lead time is 7–10 business days, with rush orders in 3–5 business days available — send your deadline with the drawing.

Working On Something For Mechanical and Equipment Builders

Send the drawing, the quantity and the date. You will get a detailed quote back within 24 hours and a straight answer on whether the date is possible.