All-in-One Solution Expert for Carbon Fiber Products
CarbonWizer Request A Quote
Aerodynamic carbon fiber road bicycle frame
Sports equipment

Carbon Fiber Bicycle Programme

Carbon fiber bike is one of the success case areas developed by the CarbonWizer team, covering aerodynamic road bicycle frames and components.

Client Background

Who the Work Was For

Bicycle and scooter brands developing composite frames and components. Carbon fiber bike and scooter products are one of the four main CarbonWizer product groups.

Project Challenge

A bicycle frame has to be stiff where power is applied and compliant where the rider sits, at a weight that metal cannot reach. That is a fibre architecture problem, not a material selection problem.

Customer Pain Points

  • Weight targets that aluminium and steel frames cannot meet
  • Stiffness and comfort pulling in opposite directions
  • Tooling investment required before a new model is proven

Our Solution

Frame tubes and components are built from unidirectional prepreg with layers of fibres oriented at different angles to provide properties designed for the specific application, in standard, high modulus and ultra high modulus grades.

Manufacturing Process

Roll wrapping for tubular sections, with compression moulding and autoclave cure for junctions and formed components. Mould design and making are carried out in house.

Supply Chain Coordination

Frame components are produced alongside any metal inserts or fittings the design needs, so the assembly arrives complete.

Quality Control

Sections are produced to the stated nominal diameters and wall thickness, and surface finish is inspected on visible frame faces.

Final Result

Carbon fiber bike and scooter products remain one of the four main product groups produced by the CarbonWizer team.

Customer Benefit

Brands can tune ride characteristics through fibre orientation rather than through tube diameter alone, and validate a frame before committing tooling.

Questions

Questions About This Case

Can you share the customer name?

No. Customer names are withheld, so projects are described by type and sector rather than by buyer.

Can you reproduce this kind of work for us?

Yes. The same route is available - requirement analysis, material and process selection, mould design and making, prototyping and production.

How long would a project like this take?

Sample orders are normally shipped within one week, and normal production orders take 15 to 25 days. Tooling lead time is quoted separately per part.

Have a Similar Project

Email the drawing, the sector and the quantity. Projects like this one start with a structural sample before any tooling is committed.