RuLin Industrial Park, Jintan, Changzhou, Jiangsu Province, China 213200
Borehole Monitoring Installation products from Avans Tech
Home / Products / Borehole Monitoring Installation

Borehole Monitoring Installation

From casing selection to the first survey reading, with one supplier responsible for the parts that have to fit each other.

Stage By Stage

Every Step And The Problem It Removes

  1. 1

    Specification

    Casing groove sizes and probe wheel spacing that do not match

    One groove standard across ABS PVC and aluminium: 5 plus minus 0.5 mm wide and 2 plus minus 0.2 mm deep.

  2. 2

    Material Selection

    Choosing between ABS PVC and aluminium without changing the probe kit

    All three are supplied to the same OD 70 plus minus 1.0 mm and coupling geometry, so only the material changes.

  3. 3

    Production

    Long project quantities arriving in unpredictable batches

    Two extrusion lines producing tens of thousands of metres per day, scheduled against your drilling programme.

  4. 4

    Borehole Fit

    Standard couplings hanging up in a tight annulus

    Flushed type casing with a 73 mm coupling instead of 76 mm.

  5. 5

    Installation

    Debris entering the casing before the first survey

    Top and bottom caps and outer protection boxes shipped with the casing.

  6. 6

    Reading

    Deciding between periodic surveys and continuous data

    Traversing probe at 0.001 degree resolution, or an in place string with RS485 output at 0.0005 degree resolution.

  7. 7

    After Delivery

    Instruments that cannot be identified after a cable break

    Identification recognition can be added so the original instrument code is recoverable.

Where It Applies

Industries Using This Approach

What You Get From One Supplier

  • Parts that match by published specification rather than by assumption
  • One contact for casing, consumables and instruments
  • ISO 9001:2015 production with traceable casing quality
  • Samples before commitment and small order quantities accepted

Questions Buyers Ask

Borehole Monitoring Installation Questions

Can you take responsibility for the whole item list

Yes. Casing, couplings, caps, protection boxes and the instruments that read the hole come from the same catalogue, so parts match by specification.

How is a large order scheduled

Two extrusion lines produce tens of thousands of metres of casing or pipe per day, and deliveries are scheduled against your programme.

Do you accept small trial orders

Yes. Small order quantities are available and free samples can be sent for evaluation.

What certification covers production

The quality management system is based upon the requirements of ISO 9001:2015.

How do we get a quotation

Send the item list, quantities and destination on WhatsApp or by email and we will reply with pricing, packing and lead time.

Plan Borehole Monitoring Installation With Us

Send the drawings, hole depths or item list and we will come back with a full quotation.