Skip to content
TITAN X POWER CO., LTD · Industrial Solar Power System Solution Provider
Request A Quote
300 kW Industrial Site Array in China
Home/Cases/300 kW Industrial Site Array in China

300 kW Industrial Site Array in China

A flat deck gives no natural tilt, so the racking has to create the angle and carry the resulting wind load, and the rows have to be spaced so they do not shade each othe

300 kW Industrial Site Array in China
China · 300 kW

300 kW Industrial Site Array in China

An industrial site with a large flat deck and an adjacent factory building. The array is built as tilted rows on the deck rather than flush to a pitched roof, giving the modules a proper tilt angle on an otherwise flat surface.

  • Client: A Chinese industrial site operator
  • Capacity: 300 kW
  • Country: China
Ask About a Similar Project
Customer Pain Points

What Made This Project Difficult

  • No natural tilt - the racking has to create the array angle
  • Wind uplift on tilted rows standing proud of a flat deck
  • Inter-row shading through the low winter sun
  • An exposed northern China site with wide seasonal temperature swing

Client Background

An industrial site with a large flat deck and an adjacent factory building. The array is built as tilted rows on the deck rather than flush to a pitched roof, giving the modules a proper tilt angle on an otherwise flat surface.

Project Challenge

A flat deck gives no natural tilt, so the racking has to create the angle and carry the resulting wind load, and the rows have to be spaced so they do not shade each other through the winter.

Our Solution

TTM modules on tilted aluminium alloy ground-style frames set on the deck, with the tilt and row pitch configured for the site rather than taken from a stock kit. Anodised aluminium frames and IP68 junction boxes handle the exposure.

Manufacturing Process

Modules produced and binned on the automated line; racking frames configured for the deck layout and pre-assembled by section.

Supply Chain Coordination

Frames and modules delivered together and grouped by row, so the crew built one row at a time across the deck.

Quality Control

Flash test and binning, plus frame straightness and clamp count checks against the layout drawing before bundling.

Final Result

A 300 kW array of long tilted rows running the length of the deck, with the factory building behind it.

Customer Benefit

Configuring tilt and row pitch for the site rather than using a stock kit meant the full deck was used without rows shading each other in winter.

FAQ

Questions About This Project

What capacity was this project

300 kW in China.

Which products were supplied

Mounting Structure; TTM Solar Panel 585-605W.

Can you supply a similar system

Yes. Send the site details and target capacity by email and we will size the array and quote the modules and racking together.

Is the client named

No. We describe the client by type rather than by name, because we do not publish customer identities without their agreement.

Have a Similar Site

Send the roof plan or plot layout and the capacity you are targeting. We will size it and quote modules and racking together.