Vehicle LED lighting factory in Foshan China since 2010 [email protected] WhatsApp +86 188 2665 4156
Technical Guide

What to Check Before Shipment of an LED Lighting Order

Rear view showing the die-cast aluminium housing and integrated heat sink fins
Rear view showing the die-cast aluminium housing and integrated heat sink fins

Pre Shipment Checks Based on In House Testing

SUNLITEC uses four in-house test machines to verify product performance before shipment: integrating sphere, vibration test machine, salt spray corrosion testing chamber, and high and low temperature alternating hot and humid testing chamber. Each test corresponds to a critical operational requirement on the vehicle or machine.

Integrating Sphere for Measured Lumen Output

The integrating sphere measures effective lumen output directly, not from emitter datasheets. This ensures the figure on the product page reflects real-world performance. Verify that the effective lumen value matches the test result for the model being ordered.

Vibration Test for Mounting Reliability

The vibration test machine simulates road or machine movement. A lamp must survive 2 hours at 10-50Hz without lens cracking, bracket loosening, or light failure. Confirm the model’s rated vibration resistance matches the operating environment.

Salt Spray Test for Corrosion Resistance

This validates IP67 and IP68 ratings. Check that the housing material (e.g. 304 stainless, 6063 aluminum) and finish (e.g. powder coating) are suitable for the deployment region’s climate.

Thermal Cycling for Extreme Environments

The high and low temperature alternating hot and humid chamber runs 16 cycles between -40°C and +50°C or +105°C. This confirms the lamp operates within its stated temperature range and maintains sealing integrity.

Matching Product Page Claims to Test Results

Every product page lists IP rating, voltage range, operating temperature, beam pattern, housing material, and lens type. Cross-check these against the test results for the batch. If a model claims IP69, it must have passed the salt spray and thermal cycling tests.

What to Verify Before Final Payment

Before shipment, confirm the model’s real power draw, effective lumen output, beam pattern, and operating temperature window are consistent with the test data. Request a test report for the batch if required.

Buyer Questions

Questions on This Topic

What tests are performed before shipment

Each batch undergoes integrating sphere lumen measurement, vibration test, salt spray corrosion test, and high-low temperature alternating humidity test.

Can I get a test report for my order

Yes. Request the test report for the batch by part number via WhatsApp or email. The report includes results from the integrating sphere, vibration, salt spray, and thermal cycling tests.

What voltage range should I expect for my model

Voltage ranges are listed on the product page. Common ranges include 9 – 32V, 9 – 48V, and 10 – 32V. Confirm the range matches the vehicle’s electrical system.

Are the LEDs from Osram or Cree as stated

Yes. The product page lists the LED chip brand. SUNLITEC uses Osram and CREE LEDs as specified. The chip type is verified during production and documented in the test report.

What beam pattern is tested

Beam patterns such as spot, flood, combo, and fog are tested using the integrating sphere and optical alignment tools. The pattern matches the specification on the product page.

Is the real power draw included in the test report

Yes. The real power draw is measured during the integrating sphere test and included in the test report. It is the actual current draw under operating conditions.

Apply This to Your Own Specification

Send the machine and the duty cycle. We will point at the models that match what you have just read.