Nesting coffee table set with black steel frames and wood-effect tops
Buying Guide

Choosing Bed Frames for Hotel and Dormitory Projects

What separates a contract bed from a retail bed, and the four specification points a tender should name.

Contract beds fail differently

A retail bed is used by one household and replaced when it is tired. A contract bed is used by hundreds of people, cleaned aggressively, and expected to last a decade.

The failure points move accordingly: joints under repeated dynamic load, coating at contact points, and the availability of a replacement part four years later.

Four points a tender should name

Frame gauge and joint type. Slat system and centre support. Coating specification at contact points. Spare parts availability and the drawing they will be built to.

A tender that names all four gets comparable quotes. A tender that names none gets the cheapest interpretation.

Bunk beds are a different product

A bunk frame carries dynamic load from someone climbing, not just static load from someone sleeping. Ladder fixing, guard rail height and post-to-rail joints are the specification, and the standard your market applies should be named at quotation.

Phasing and colour

A project that delivers in phases will show any colour drift between phases. Where the quantity allows, have each phase coated together, and keep the approved sample as the reference across the whole programme.

Do not forget the bedside

The night stand is what makes the room look designed rather than assembled. Order it with the bed so both are coated in the same batch.

Every process description above reflects how Wanhao runs an order. Figures the factory has never published — lead times, capacity, certificate scope — are confirmed in writing at quotation rather than stated here.
Answers

Questions on This Topic

Do metal beds need to meet a specific standard?

It depends on the market and the application. Name the standard in the tender and ask for written confirmation per model.

Can spare parts be ordered years later?

Where parts are produced to a fixed drawing, yes. Confirm this in writing before the order, not after.

Have a Question This Guide Did Not Answer

Send it with the product and the market you are working on. You get a straight answer, including where the answer is that we cannot confirm it yet.