
Quality Control From Incoming Material to Loaded Container
Furniture fails in a small number of predictable places: the joint, the coating, the fixing hardware and the carton. The inspection points below are placed at those four, rather than spread evenly across a process for the sake of a flowchart.
How This Runs
Eight stages, each with a decision that belongs to the buyer as much as to the factory.
Incoming material
Steel, panel, glass and fabric checked against the model specification.
First-article check
The first piece off the line is checked against the approved sample.
In-process frame check
Frames checked flat and square before surface preparation.
Coating check
Colour and coverage checked against the approved sample.
Hardware pack audit
Pack contents counted against the instruction sheet.
Assembly trial
Units assembled from the carton to confirm fit and instructions.
Carton and marking check
Carton, print and handling marks verified before sealing.
Pre-shipment inspection
Sampled against the agreed AQL before loading.
What Each Stage Actually Decides
- Incoming materialSteel, panel, glass and fabric checked against the model specification.
- First-article checkThe first piece off the line is checked against the approved sample.
- In-process frame checkFrames checked flat and square before surface preparation.
- Coating checkColour and coverage checked against the approved sample.
- Hardware pack auditPack contents counted against the instruction sheet.
- Assembly trialUnits assembled from the carton to confirm fit and instructions.
- Carton and marking checkCarton, print and handling marks verified before sealing.
- Pre-shipment inspectionSampled against the agreed AQL before loading.
Ranges This Capability Serves
Living Room Furniture
582 models · TV units, racks, tables and storage
Bed Room Furniture
127 models · Beds, bedsides and bedroom storage
Dining Furniture
161 models · Dining sets, bar sets and trolleys
Office Furniture
127 models · Computer, student and writing desks
Chairs
54 models · Dining, folding and stacking seating
Bamboo Products
50 models · Bamboo shelving, racks and storage
The Stages Either Side of This One
OEM and ODM Development
From a reference photo to an approved sample to a repeatable production run
Steel Frame Fabrication
Cutting bending welding and coating on one site
Panel and Glass Components
The surfaces that sit on the frame
Flat-Pack Engineering
Fewer parts fewer steps fewer returns
Export Packing and Logistics
120 countries of shipping history behind the packing drawing
Quality Control Programme — Questions
What AQL do you inspect to?
The AQL is agreed with the buyer per order. Tell us the level your account works to.
Can we send a third-party inspector?
Yes. Third-party inspection is normal on retail orders — book it against the loading date.
Do you keep the approved sample?
The approved sample is retained as the production reference.
What certifications does the factory hold?
Certificate status is confirmed per order in writing. It is not published in the catalogue because it changes with scheme and scope.
Put Quality Control Programme to Work on Your Programme
Send the product, the target market and the volume. We tell you what is already tooled and what is not.