Custom Soft PVC Souvenirs and Promotional Gifts · Yiwu, Zhejiang, China
Request a Quote
Solution

From Your Artwork to a Finished Mould

Everything that goes wrong in a moulded product goes wrong at the drawing stage, which is why this is the part we slow down and the rest we do fast.

Production floor at the Rich Industry factory in Yiwu
In Short

What This Covers

Send a JPG, AI, CDR or PDF file and our designer converts it into a mould drawing: colour separation, relief depth, thin-section checks and the fixing point for a magnet, ring or strap. You approve that drawing before any steel is cut.

Step by Step

How It Runs

  1. Artwork received

    JPG, AI, CDR or PDF are all accepted. A rough sketch or a photograph is enough to start; it does not have to be print-ready.

  2. Feasibility review

    We check the smallest features, the thinnest sections and the colour count against what soft PVC moulding can actually hold at your intended size.

  3. Mould drawing

    The design is redrawn for production: colour fields separated by raised keylines, relief heights assigned, fixing point placed.

  4. Your approval

    Nothing is tooled until you sign off the drawing. This is where changes are free.

  5. Tooling

    The mould is cut, with cavity layout planned around your order quantity.

  6. First sample

    4 to 6 days for a custom design. Existing designs sample in 1 to 2 days.

  7. Sample approval

    You approve a physical part, not a rendering. The approved sample is kept here as the reference for production.

Failure Modes

What This Stage Is Guarding Against

1

Detail that disappears

Fine line work below roughly one millimetre of raised width tends to fill or flash. We identify it on the drawing and thicken or simplify it with your agreement.

2

Thin sections that snap

Spires, antlers, tails and narrow joins are the usual failure points. They are thickened or tied back into the body before tooling.

3

Colours bleeding together

Adjacent colour fields need raised separating walls in the tool. Shallow walls are the main cause of muddy multi-colour parts.

4

Fixings in the wrong place

A magnet off the centre of mass makes a piece tilt; a ring eyelet on a thin edge tears out. Both are set on the drawing.

The Numbers

Timings You Can Plan Against

91Designs online
5,000 pcsMOQ per design
10-15 daysProduction at MOQ
8 working hoursQuotation turnaround
Questions

Artwork to Tooling Questions

What file format do you need?

JPG, AI, CDR or PDF. Vector files are easier to work from, but a clear photograph or a hand sketch is a perfectly good starting point.

Do we pay for the mould drawing?

The drawing is part of the quotation process. Tooling is quoted separately and confirmed before it is cut.

Can we change the design after seeing the sample?

Changes to colour are straightforward. Changes to shape mean modifying or recutting the tool, which is why the drawing approval stage matters so much.

Who owns the mould?

Tooling ownership is agreed in the quotation. Say at the outset if you need exclusivity on a design so it is written into the terms.

Start With Artwork to Tooling

Send what you have, even if it is only a photograph and a quantity. We will tell you what is achievable before anything is tooled.