Operator entering a programme at the control panel of a production machine

Solution

Custom Development and New References

If a reference is not in the 1,000 variety catalogue it can be developed. Continuous development capability runs at 80 to 100 new varieties a year, and a newly developed item is delivered in 30 to 45 days, which is faster than the 45 days a regular catalogue item takes.

How it runs

80 to 100 new varieties a year, 30 to 45 days each

01

Send the sample or the number

A physical sample, a drawing or an OE number with the application.

02

Development

The item is engineered against the sample and the application it has to serve.

03

Validation

New items are tested by extreme cross-country race with modified cars before release.

04

First article

Accessories are processed by CNC centre in one time so the maximum precision is guaranteed.

05

Delivery

Newly developed items run 30 to 45 days.

What backs it up

The Detail Behind the Claim

  • Continuous development capability of 80 to 100 varieties a year
  • New item testing by extreme cross-country race with modified cars
  • CNC centre machining in a single setup for maximum precision
  • Components re-engineered and redesigned to perform better than OEM parts
Operator entering a programme at the control panel of a production machine

Operator entering a programme at the control panel of a production machine.

FAQ

Custom Development and New References FAQ

How long does a new reference take?

30 to 45 days for a newly developed item.

What do you need from me to start?

A sample, a drawing or an OE number with the application it has to fit.

How is a new part validated?

New items are tested by extreme cross-country race with modified cars.

Is there a development minimum quantity?

The company supports customer demand for small quantities with a minimum order of one piece.

Next step

Put It to Work on a Real Part

Send the reference, the vehicle and the quantity. The rest follows from there.