Long production line with material handling and machining stations

Knowledge Centre · 2025-02-17

Inside an Integrated Drive Shaft Plant

What it means for a drive shaft factory to run casting, machining and assembly under one roof, and how that changes lead time and traceability for the buyer.

Suzhou Kingrun Auto Co., Ltd. The factory has a complete production system. It starts with raw material control and carefully selects high-quality parts to ensure solid product quality. In the machining process, it is equipped with advanced CNC machining equipment and experienced technicians, which can carry out high-precision processing of parts, so that each part meets strict standards. After machining, enter the assembly process. In strict accordance with the process requirements, the workers will accurately assemble each part to form the drive shaft finished product. In this process, a number of quality testing procedures are also set up to comprehensively test the performance and accuracy of the drive shaft, without letting go of any minor defects. After the finished product is qualified, it enters the packaging link. The factory uses customized packaging solutions to ensure that the drive shaft is not damaged during transportation and storage. After the packaging is completed, the product can be sold and shipped to customers at home and abroad. This integrated process from parts procurement to machining, assembly, finished product testing to packaging and sale not only improves production efficiency, reduces production costs, but more importantly, realizes the full control of product quality, providing customers with more reliable and better quality drive shaft products. The successful model of the factory provides a useful reference for the development of the drive shaft manufacturing industry.

FAQ

Supply Questions

Can you supply the parts described here?

Yes. Send the OE number and the vehicle and we return the interchange references we hold.

What is the minimum order?

One piece, so a reference can be proven on a vehicle before it is stocked.

How long is the lead time?

45 days for regular items and 30 to 45 days for newly developed references.

Are rotating parts balanced?

Yes, a 100% dynamic balance test based on the G16 standard.

Next step

Turn This Into a Quotation

If this article covers the part you are chasing, send the OE number and the vehicle and we will price it.

Office hours
Monday to Friday 08:30-18:00 China Standard Time (GMT+8)