Building a Hospital Herb Decoction Centre That Clears the Session

A hospital decoction room is a throughput problem before it is an equipment problem. The dispensing window closes at a fixed time, the electrical supply is what the building already has, and the staff count is not going up. This is how we size and fit out that room.

What You End Up With

What the Finished Room Does

The measure is simple: every prescription taken in during a session is decocted, sealed, labelled and handed over before the window closes.

  • Three prescriptions decocted in parallel on one frame with 20,000 ml per pot
  • Sealed single-dose pouches between 50 and 250 ml handed over with a patient label
  • Automatic transfer from soft fire to strong fire so batch strength does not depend on who is on shift
  • Total power confirmed with the hospital engineering team before the build starts
  • Wear parts and packing film held on site so a fault does not stop a session
  • Operators trained on installation, daily cleaning and first-line fault diagnosis
What It Replaces
  • A boiling range that ties one member of staff to watching fire strength all session
  • Hot liquid ladled by hand into bottles at a separate bench
  • Loose bottles that are hard to label per patient and awkward to carry home
  • Two footprints and two operators for what one frame can do
  • Batch strength that changes between operators and between days
Stage By Stage

Every Stage From Enquiry to a Working Room

Where projects go wrong is rarely the machine. It is a power supply nobody checked, a door narrower than the frame, or film ordered too late.

01 · Volume Analysis
The problem

Buyers ask for a model number before anyone has counted prescriptions per session, so the machine either cannot clear the window or is twice the size needed.

How we handle it

We start from prescriptions per session and pairs per prescription, and work back to pot volume, pot count and cycle time. The model comes out of that arithmetic, not the other way round.

02 · Room and Access Survey
The problem

A machine 1400 mm wide arrives at a door that is 900 mm, or the room has no clearance above the pot lids.

How we handle it

We send dimensions and clearances before the order and ask for door widths and ceiling height. If the frame will not get in, we say so before it is built.

03 · Electrical Sign Off
The problem

A three-pot unit draws 6,300 W. Older pharmacy supplies often cannot take that alongside everything else on the circuit.

How we handle it

Total power and voltage are confirmed in writing with your engineering team before the build starts. Voltages other than 220 V are built to order rather than adapted with a transformer on site.

04 · Specification and Build
The problem

Pouch size and fill volume set at the factory rarely match how a specific pharmacy doses.

How we handle it

Pouch length between 95 and 180 mm, fill volume between 50 and 250 ml, and English control panel labelling are all set before the build. Payment by T/T starts it.

05 · Test and Shipment
The problem

A machine tested only in sections can still fail as a complete cycle on site.

How we handle it

Every unit is run as a full decoction and sealing cycle before packing. Wear parts and packing film go in the crate, and export documents are issued with the shipment.

06 · Commissioning and Training
The problem

A commissioned machine that nobody has been trained on becomes a machine that is used at half its rate.

How we handle it

Free remote video guidance covers most installations. For multi-unit orders we send a technician to install and train operators, and we can train your maintenance staff at the Tianjin plant.

07 · Running and Consumables
The problem

Sites run out of packing film or lose the wear parts that shipped with the machine.

How we handle it

Film and non-woven bags are reordered from the same supplier as the machine so the pouch always matches the sealing jaws. We set a reorder point with you at handover.

08 · Long Term Support
The problem

Once the warranty ends, some suppliers stop answering.

How we handle it

Video diagnosis stays free with no end date. After the warranty, parts are supplied at cost price and you cover the freight.

Equipment In This Setup

Equipment That Goes Into This Room

Huayan HCK2000 normal pressure TCM herb decoction and packing machine featuring three 20000 ml glass pots and integrated pouch sealer
Normal-Pressure Decoction Normal Pressure Herb Decoction and Packing Machine HCK2000 The HCK2000 is a normal-pressure TCM herb decoction and packing machine combining three 20,000 ml glass pots and an... View specifications
Huayan HCR2000 normal-pressure TCM herb decoction and packing machine with two glass pots
Normal-Pressure Decoction Normal Pressure Herb Decoction and Packing Machine HCR2000 The HCR2000 is a normal-pressure herb decoction and packing machine that boils two separate prescriptions... View specifications
Huayan HVK2000 micro-pressure TCM herb decoction and packing machine with three 20000 ml glass pots and integrated pouch sealer
Micro-Pressure Decoction Micro Pressure Herb Decoction and Packing Machine HVK2000 The HVK2000 is a micro-pressure TCM herb decoction and packing machine that boils three separate prescriptions... View specifications
Huayan HYLK22X automatic twice herb decoction and packing machine with three glass pots and integrated pouch sealer
Twice Decoction Automatic Twice Herb Decoction Machine HYLK22X The HYLK22X is an automatic twice decoction and packing machine that extracts herbal ingredients through two sequential... View specifications
Huayan HYY15L*2 twin airtight stainless steel herb decoction machine front view
Airtight Decoction Composite Airtight Herb Decoction Machine HYY15L x2 The HYY15L*2 is an airtight TCM herb decoction machine featuring two 15,000 ml hermetically sealed stainless steel pots... View specifications
Huayan HYY series airtight TCM herb decoction machine with stainless steel pressure cylinder and hand extrusion device
Airtight Decoction Airtight Herb Decoction Machine HYY13L The HYY13L is a single airtight TCM herb decoction machine that extracts one prescription of 2 to 12 pairs in a sealed... View specifications
Rolls of Huayan TCM herb liquid packaging film for automatic pouch sealing machines
Packing Film TCM Herb Liquid Packing Film and Non-Woven Bags Huayan TCM herb liquid packaging film and non-woven bags provide clean containment consumables for automated herb... View specifications
Huayan DQ-101 compact electric TCM herb raw material slicing machine with stainless steel vessel
Pulverizers and Slicers TCM Herb Raw Material Slicing Machine DQ101 The DQ-101 is a compact benchtop TCM herb raw material slicing machine designed for TCM clinics, hospital pharmacies,... View specifications
Questions Buyers Ask

Hospital Herb Decoction Centre FAQ

How many machines does a busy outpatient pharmacy need?
It depends on prescriptions per session and cycle time rather than on daily totals. A three-pot unit clears three prescriptions per cycle. Send us your session numbers and we will do the arithmetic.
What total power should we plan for?
A three-pot normal-pressure unit such as the HCK2000 draws 6,300 W on a 220 V supply. Sealed extraction machines draw 1,800 W per pot. Exact figures are confirmed before the build.
Can the room mix sealed extraction and packing machines?
Yes, and many hospital rooms do. Airtight machines extract large-dose formulas while a separate packing machine seals pouches, so the two stages run in parallel.
Who installs and commissions the equipment?
Most sites install with free remote video guidance. For multi-unit orders we send a technician to install the machines and train operators on site.
How much packing film should we order with the machine?
Work from pouches per session and lead time on reorders. We set a reorder point with you at handover so you are never sealing on the last roll.
What is the delivery time for a full room?
Generally about 6 days after payment is received for the build, plus freight to your port. Multi-unit orders ship together to save on freight.

Send us your session volume and we will size the room

Prescriptions per session, largest prescription in pairs, voltage, floor area and door width. We come back with a layout, a model shortlist and a total power figure.