DoubleTree by Hilton Tucson Arizona
Project Case Study

180 Lighted Mirrors for DoubleTree by Hilton in Tucson

180 units at W40" x H30" installed at the property.

Client Background

The Property

DoubleTree by Hilton at 280 S Church Ave, Tucson, AZ 85701, USA — a downtown full service hotel operating under a Hilton brand standard.

The Challenge

180 guest bathroom mirrors at a single size of W40" x H30", all of which had to match each other and pass a Hilton brand finish review.

Customer Pain Points

  • A brand standard review that a new supplier usually fails at least once
  • A single repeated size, which makes any variation between units obvious
  • A live downtown property with limited space for deliveries and storage
Our Solution

What We Supplied

A framed hotel LED mirror built to the Hilton standard we already supply, with 5mm environmental silver glass, safety backing, a powder coated anti-rust body and UL listed electrical parts.

Lighted mirror for Hilton hotel

Manufacturing Process

All 180 units were produced in one batch with the glass, frosting and LED output fixed across the order, so unit 1 and unit 180 came off the line to the same specification.

Supply Chain Coordination

Shipment was arranged from the factory to the property with customs cleared, so the mirrors arrived as the bathrooms were finished rather than sitting in a bonded warehouse.

Quality Control

Every mirror was inspected before assembly and the mounting system was load tested. Each unit was cleaned on every surface, including the rear, before packing.

Final Result

What Went In

180 units at W40" x H30" installed at the property.

Customer Benefit

The owner got a mirror that cleared the brand review without a rejected sample round, and a supplier who could repeat the same unit if the property needed replacements later.

Project Photography

Mirrors at the Property

Questions

Questions About This Project

What was supplied to this property?

180 units at W40" x H30" installed at the property.

How long did production take?

30 to 45 working days after the drawing was approved, followed by freight and customs clearance.

Were the mirrors delivered to the site?

Yes. We ship from our factory to the project site or the warehouse and clear customs.

Can the same specification be repeated for another property?

Yes. The approved drawing stays on file, so a later order matches the units already installed.

Running A Similar Project

Send the room count, the mirror sizes and the date the bathrooms are due to be finished. We will work the programme back from there.