Lighted mirror for Marriott hotel in Tacoma, Washington,USA
Project Case Study

306 Lighted Mirrors for a Marriott Hotel in Tacoma

306 units in different sizes installed across the property.

Client Background

The Property

TCCH Hotel by Marriott in Tacoma, Washington State, USA — a full service hotel with several guest room types.

The Challenge

306 mirrors across different sizes, all of which had to look identical in the room even though the widths differed by room type.

Customer Pain Points

  • Several mirror widths in one order, with no visible difference allowed
  • A large unit count where a single batch variation multiplies across floors
  • A programme where mirrors could not arrive before the bathrooms were ready
Our Solution

What We Supplied

The HQ002 frameless model, produced in the required size range with the frosting width and LED output held constant as the mirror got wider.

Lighted mirror

Manufacturing Process

All sizes were produced in the same batch from the same glass and LED specification, which is what keeps a W36 and a W60 reading the same on adjacent floors.

Supply Chain Coordination

Delivery was arranged to the property with customs cleared, scheduled against the bathroom fit-out rather than the production completion date.

Quality Control

Each mirror was tested and inspected before packing, with the load bearing test applied to the mounting system.

Final Result

What Went In

306 units in different sizes installed across the property.

Customer Benefit

A single approval covered every room type, and the model has since been specified by other project teams as HQ002.

Project Photography

Mirrors at the Property

Questions

Questions About This Project

What was supplied to this property?

306 units in different sizes installed across the property.

How long did production take?

30 to 45 working days after the drawing was approved, followed by freight and customs clearance.

Were the mirrors delivered to the site?

Yes. We ship from our factory to the project site or the warehouse and clear customs.

Can the same specification be repeated for another property?

Yes. The approved drawing stays on file, so a later order matches the units already installed.

Running A Similar Project

Send the room count, the mirror sizes and the date the bathrooms are due to be finished. We will work the programme back from there.