306 Lighted Mirrors for a Marriott Hotel in Tacoma
306 units in different sizes installed across the property.
The Property
TCCH Hotel by Marriott in Tacoma, Washington State, USA — a full service hotel with several guest room types.
The Challenge
306 mirrors across different sizes, all of which had to look identical in the room even though the widths differed by room type.
Customer Pain Points
- Several mirror widths in one order, with no visible difference allowed
- A large unit count where a single batch variation multiplies across floors
- A programme where mirrors could not arrive before the bathrooms were ready
What We Supplied
The HQ002 frameless model, produced in the required size range with the frosting width and LED output held constant as the mirror got wider.

Manufacturing Process
All sizes were produced in the same batch from the same glass and LED specification, which is what keeps a W36 and a W60 reading the same on adjacent floors.
Supply Chain Coordination
Delivery was arranged to the property with customs cleared, scheduled against the bathroom fit-out rather than the production completion date.
Quality Control
Each mirror was tested and inspected before packing, with the load bearing test applied to the mounting system.
What Went In
306 units in different sizes installed across the property.
Customer Benefit
A single approval covered every room type, and the model has since been specified by other project teams as HQ002.
Mirrors at the Property


Models Used on This Project
High Quality Lighted Mirror Model HQ002
HQ002 is the frameless model that went into the TCCH Hotel by Marriott in Tacoma, Washington. It is a project-proven layout rather t...
View Model DetailsHigh Quality Lighted Mirror Model HQ001
HQ001 is the model most of our hotel clients order first. It is a plain rectangular frameless mirror with a frosted light band, and ...
View Model DetailsOther Properties We Have Supplied
DoubleTree by Hilton Tucson Arizona
180 units at W40" x H30" installed at the property.
Read MoreMontreal Marriott Chateau Champlain
Framed LED mirrors installed at the property in Montreal.
Read MoreBest Western Plus Antioch Tennessee
Lighted mirrors installed across the property in Antioch.
Read MoreAvid Hotel by IHG Miami Florida
Lighted mirrors installed at the Avid Hotel in Miami.
Read MoreHoliday Inn Express and Suites Mount Juliet Nashville
174 units at W42" x H36" installed at the property.
Read MoreQuestions About This Project
What was supplied to this property?
306 units in different sizes installed across the property.
How long did production take?
30 to 45 working days after the drawing was approved, followed by freight and customs clearance.
Were the mirrors delivered to the site?
Yes. We ship from our factory to the project site or the warehouse and clear customs.
Can the same specification be repeated for another property?
Yes. The approved drawing stays on file, so a later order matches the units already installed.
Running A Similar Project
Send the room count, the mirror sizes and the date the bathrooms are due to be finished. We will work the programme back from there.
