The Property

Montreal Marriott Chateau Champlain, 915 Peel Street, Montreal QC H3B 4C9, Canada — a landmark downtown hotel.

The Challenge

A framed mirror for a property where the bathroom is part of a designed scheme rather than a standard module, in a Canadian market with its own electrical expectations.

Customer Pain Points

  • A framed mirror that has to read as joinery, not as a light fitting
  • Canadian electrical requirements alongside the United States specification
  • A landmark property where the finish is scrutinised closely
Our Solution

What We Supplied

A framed LED mirror with a powder coated metal frame, 5mm environmental silver glass and electrical parts that are UL listed or CE certified, covered by our cUL and cETL certificates for Canada.

Lighted mirror with frame for Marriott Hotel

Manufacturing Process

Frames were welded and powder coated before assembly so the corners survive handling, then bonded to the glass and light box as a single structural assembly.

Supply Chain Coordination

Shipment to Canada with customs clearance handled as part of the supply, delivered against the fit-out programme.

Quality Control

Frame finish was checked batch by batch so the colour did not drift between the first and last carton, and each unit was cleaned and inspected before packing.

Final Result

What Went In

Framed LED mirrors installed at the property in Montreal.

Customer Benefit

The design team got a decorative mirror with North American electrical certification from one supplier, rather than splitting the frame and the lighting between two.

Project Photography

Mirrors at the Property

Questions

Questions About This Project

What was supplied to this property?

Framed LED mirrors installed at the property in Montreal.

How long did production take?

30 to 45 working days after the drawing was approved, followed by freight and customs clearance.

Were the mirrors delivered to the site?

Yes. We ship from our factory to the project site or the warehouse and clear customs.

Can the same specification be repeated for another property?

Yes. The approved drawing stays on file, so a later order matches the units already installed.