How a Cold Storage Project Starts
Most cold storage projects go wrong in the first week, not the last. If volume, target temperature, product type and site climate are not pinned down before pricing, every later decision inherits the error.
- Stage 01 of 6
The starting point is three numbers and one location: how much you need to store, at what temperature, and where the building sits. From those, our engineers produce a preliminary heat load, a chamber layout and a budget estimate — normally within 48 hours.
We then issue technical drawings and a 3D model of the proposed facility. Buyers who have never commissioned a cold store before use the model to check the things drawings hide: where forklifts turn, how far a pallet travels from dock to rack, whether the plant room door is reachable with a compressor on a pallet truck.
Only when the layout is agreed does the scope get frozen and priced properly. Everything after that — procurement, construction, commissioning, training and handover — follows the document set issued at this stage.

What This Stage Covers
- Storage volume in cubic metres or tonnage
- Target temperature band and product type
- Site location, climate and available power supply
- Throughput: pallets in and out per day, and peak season behaviour
- Any local fire, seismic or food-safety codes that apply
Projects Delivered Through This Process
50,000m³ Cold-Chain Logistics — Wuhan Xinpu Fruit
Two-stage 50,000 m³ cold-chain logistics centre for Wuhan Xinpu Fruit — fruit & meat distribution hub.

1,643 m² Controlled-Atmosphere Cold Storage
1,643 m²/5,749 m³ CA cold storage with 6 partitioned rooms and Hanbell screw parallel refrigeration system.

1,000-Ton Strawberry CA Cold Storage — Dandong
1,000-ton strawberry CA cold storage divided into 12 partition rooms — extends harvest season.
Project Starting Process Questions
What information do you need to quote?
Storage volume or tonnage, target temperature, product type and site location. With those four we can return a preliminary design and budget estimate.
How quickly do you respond?
Our engineering team replies within 24 hours, with a feasibility outline and budget estimate usually inside 48 hours.
Do you provide drawings before an order?
Yes. Technical drawings and a 3D layout are issued so the plan can be reviewed before any commitment.
Move To The Next Stage
Send volume, temperature, product type and location and our engineers will start the preliminary design.