Equipment Selection and Supply Chain Control
Component matching is an engineering exercise, not a purchasing one. A compressor, condenser and evaporator that are individually excellent can still make a plant that hunts, short-cycles and never reaches set point.
- Stage 04 of 6
Refrigeration equipment and cold storage components are designed and matched using scientific analysis, so that the main operating parameters are controlled with precision across the whole load range rather than at one design point.
Core components come from premium brands — Bitzer, Emerson, Refcomp, Frascold and Hanbell — through a supply chain of 50+ trusted suppliers built up over the company's history.
Everything is factory-tested before shipment and packed in export wooden cases. Standard equipment production runs 20-30 days after deposit.

What This Stage Covers
- Compressor selection against the full load range, not one design point
- Condenser sizing for the destination climate
- Evaporator selection for throw distance, fin spacing and defrost method
- Valve, control and safety component matching
- Factory test before shipment
- Export wooden case packing and container loading
Projects Delivered Through This Process
50,000m³ Cold-Chain Logistics — Wuhan Xinpu Fruit
Two-stage 50,000 m³ cold-chain logistics centre for Wuhan Xinpu Fruit — fruit & meat distribution hub.

1,643 m² Controlled-Atmosphere Cold Storage
1,643 m²/5,749 m³ CA cold storage with 6 partitioned rooms and Hanbell screw parallel refrigeration system.

1,000-Ton Strawberry CA Cold Storage — Dandong
1,000-ton strawberry CA cold storage divided into 12 partition rooms — extends harvest season.
Material and Equipment Purchasing Questions
Can we specify the compressor brand?
Yes. Bitzer, Emerson, Copeland, Refcomp, Frascold, Hanbell, Tecumseh and Bristol are used depending on unit type and capacity, and brand can be fixed at order.
Is equipment tested before it ships?
Yes. Units are factory-tested before shipment and packed in export wooden cases.
What is the production lead time?
20-30 days after deposit for standard equipment.
Move To The Next Stage
Send volume, temperature, product type and location and our engineers will start the preliminary design.