Construction and Installation To the Design Scheme
A cold store is system engineering made of precision components. Panels, plant, pipework and doors have to be installed strictly according to the design scheme, because each one depends on the tolerances of the others.
- Stage 05 of 6
The build sequence follows the document pack: foundations and steel structure, then the insulated envelope, then refrigeration and pipework, then electrical, control and fire systems, then commissioning.
For export work Howcool sends installation supervision, and where the contract requires it, full crews — welders, electricians, refrigeration technicians and NDT inspectors — so the site is not dependent on local contractors who have never built a cold store.
Programme discipline is part of the scope. Our 3,000 m2 cold-chain logistics warehouse was completed in 90 days, and the 50,000 m3 Wuhan facility was delivered in two stages of 90 and 50 days while the client stayed operational.

What This Stage Covers
- Foundations, steel structure and floor build-up with anti-frost-heave heating
- Insulated panel envelope with sealed joints
- Refrigeration plant, pipework, pressure test and charging
- Electrical, PLC control and fire protection systems
- Door installation, frame heating and alignment
- Commissioning, pull-down test and handover documentation
Projects Delivered Through This Process
50,000m³ Cold-Chain Logistics — Wuhan Xinpu Fruit
Two-stage 50,000 m³ cold-chain logistics centre for Wuhan Xinpu Fruit — fruit & meat distribution hub.

1,643 m² Controlled-Atmosphere Cold Storage
1,643 m²/5,749 m³ CA cold storage with 6 partitioned rooms and Hanbell screw parallel refrigeration system.

1,000-Ton Strawberry CA Cold Storage — Dandong
1,000-ton strawberry CA cold storage divided into 12 partition rooms — extends harvest season.
Construction and Installation Questions
Do you install or only supply?
Both models are available. Equipment-only supply, installation supervision over the client's contractor, or full installation by Howcool crews.
How long does installation take?
It depends on scale. Reference programmes from delivered projects: 90 days for a 3,000 m2 logistics warehouse, 140 construction days across two stages for 50,000 m3 in Wuhan.
Can construction be phased around an operating facility?
Yes. Phased handover keeps part of the site running, as on the Wuhan two-stage project.
Move To The Next Stage
Send volume, temperature, product type and location and our engineers will start the preliminary design.