Skip to Content
Taizhou Wefor Sports Goods Co., Ltd. [email protected] +86 523 8323 9889 9:00 - 19:00 China Standard Time

Industry Application

Family Entertainment Centres

Arcades bowling centres and leisure parks where a table is a revenue asset measured on uptime. Air hockey and foosball take continuous unsupervised play from children and adults alike.

Get a Custom Solution Talk to an Engineer

Industry Pain Points

What Goes Wrong in This Segment

Machines are played continuously during peak season

Pucks pushers and balls disappear weekly

A failed scorer takes a machine out of the earning line

Operators need one supplier across several machine types

Site branding has to be consistent across the floor

Customer Requirements

  • Consumables in bulk with the machines
  • Standalone replacement scorers
  • Robust cabinet and playfield specification
  • Playfield graphics carrying the site brand
  • Repeat order supply that does not run dry

Solution Flow

From Enquiry to Installed Tables

01020304050607Floor PlanGraphics SpecConsumableForecastSampleApprovalBulk PackingContainerReplenishment

Delivery Capability

Machines ship with a forecast quantity of pucks pushers balls players and rod caps. Scorers are available as standalone replacements so a fault is a swap rather than a service call.

Sample policy production planning quality checks packing and after sales each have a dedicated page setting out exactly what happens and what you receive.

See all sourcing solutions

Related Guides

Questions Answered

Family Entertainment Centres FAQ

Do You Supply Family Entertainment Centres Buyers Directly
Yes. We are the manufacturer in Taizhou Jiangsu and we sell direct. OEM and ODM orders are accepted and the customer logo can be added.
What Is the Minimum Order for This Kind of Project
Usually our MOQ is 20 containers for each kind of table but we can accept a lower quantity for a trial order. Tell us the project size and we will advise honestly.
Can You Match a Specification Across Several Sites
Yes. The approved sample becomes the production standard for the run so repeat orders and multi site rollouts stay consistent.
Do You Supply the Spare Parts As Well As the Tables
Yes. Every wearing part in the range is a catalogue item so a table can be serviced years after installation.
How Long Does Production Take
Sample lead time is three days from stock or about 15 to 30 days if production has to be arranged. Production lead time for a full order is confirmed against your shipping date when the order is booked.

Next Step

Planning a Project for Family Entertainment Centres

Tell us the site count the table mix and the timeline. We will come back with a specification a price and a realistic production date.

Get a Custom Solution Email Us Download Catalogue Talk to an Engineer
WhatsApp Email