Skip to Content
Taizhou Wefor Sports Goods Co., Ltd. [email protected] +86 523 8323 9889 9:00 - 19:00 China Standard Time

Industry Application

Bars and Restaurants

Pool tables and foosball tables that earn their floor space in a licensed venue. Heavy evening play spilled drinks and no maintenance window until the venue closes.

Get a Custom Solution Talk to an Engineer

Industry Pain Points

What Goes Wrong in This Segment

Tables are played hard for four hours a night and never rested

Spills reach the cloth the playfield and the cabinet

Floors are rarely level so the table has to be trued on site

A table out of service on a Friday is lost revenue

Venue branding matters as much as play quality

Customer Requirements

  • Cloth and cushion specification matched to heavy play hours
  • Adjustable levelling on every table
  • On site spares so a rod or a cue is replaced the same night
  • Cabinet graphics carrying the venue brand
  • A supplier who stocks the consumables

Solution Flow

From Enquiry to Installed Tables

01020304050607Venue SurveyBrandingArtworkCloth GradeSampleApprovalVenueDeliverySiteLevellingStandingSpares

Delivery Capability

Venue orders ship with a consumable pack. Cloth cushion rubber cues balls players and rod caps are quoted alongside the tables so the venue has stock before the first failure.

Sample policy production planning quality checks packing and after sales each have a dedicated page setting out exactly what happens and what you receive.

See all sourcing solutions

Related Guides

Questions Answered

Bars and Restaurants FAQ

Do You Supply Bars and Restaurants Buyers Directly
Yes. We are the manufacturer in Taizhou Jiangsu and we sell direct. OEM and ODM orders are accepted and the customer logo can be added.
What Is the Minimum Order for This Kind of Project
Usually our MOQ is 20 containers for each kind of table but we can accept a lower quantity for a trial order. Tell us the project size and we will advise honestly.
Can You Match a Specification Across Several Sites
Yes. The approved sample becomes the production standard for the run so repeat orders and multi site rollouts stay consistent.
Do You Supply the Spare Parts As Well As the Tables
Yes. Every wearing part in the range is a catalogue item so a table can be serviced years after installation.
How Long Does Production Take
Sample lead time is three days from stock or about 15 to 30 days if production has to be arranged. Production lead time for a full order is confirmed against your shipping date when the order is booked.

Next Step

Planning a Project for Bars and Restaurants

Tell us the site count the table mix and the timeline. We will come back with a specification a price and a realistic production date.

Get a Custom Solution Email Us Download Catalogue Talk to an Engineer
WhatsApp Email