Skip to Content
Taizhou Wefor Sports Goods Co., Ltd. [email protected] +86 523 8323 9889 9:00 - 19:00 China Standard Time

Industry Application

Home Game Rooms

Families buying a soccer table a pool table or a combination unit for a basement garage or spare room. The largest volume segment in the leisure table market and the least forgiving on packaging and assembly.

Get a Custom Solution Talk to an Engineer

Industry Pain Points

What Goes Wrong in This Segment

Room measurements are tight and the cue swing or rod travel is forgotten until the table arrives

The carton has to fit through a normal doorway and down a domestic staircase

Assembly instructions have to work for a buyer who has never built a table

A damaged panel on arrival becomes a full return rather than a part swap

Buyers compare on photographs so the cabinet finish carries the sale

Customer Requirements

  • Compact and mid size cabinets rather than club specification
  • Flat pack cartons sized for domestic delivery
  • Clear illustrated assembly manuals
  • Replacement panels and parts available after the sale
  • Photogenic finishes and printed graphics

Solution Flow

From Enquiry to Installed Tables

01020304050607Room SurveySize andFinishArtworkApprovalSample PhotosProductionContainerSpares Stock

Delivery Capability

Flat pack cartons planned for domestic courier and retail shelf. Replacement parts held as catalogue lines so a damaged panel or a broken rod is a part order rather than a return.

Sample policy production planning quality checks packing and after sales each have a dedicated page setting out exactly what happens and what you receive.

See all sourcing solutions

Related Guides

Questions Answered

Home Game Rooms FAQ

Do You Supply Home Game Rooms Buyers Directly
Yes. We are the manufacturer in Taizhou Jiangsu and we sell direct. OEM and ODM orders are accepted and the customer logo can be added.
What Is the Minimum Order for This Kind of Project
Usually our MOQ is 20 containers for each kind of table but we can accept a lower quantity for a trial order. Tell us the project size and we will advise honestly.
Can You Match a Specification Across Several Sites
Yes. The approved sample becomes the production standard for the run so repeat orders and multi site rollouts stay consistent.
Do You Supply the Spare Parts As Well As the Tables
Yes. Every wearing part in the range is a catalogue item so a table can be serviced years after installation.
How Long Does Production Take
Sample lead time is three days from stock or about 15 to 30 days if production has to be arranged. Production lead time for a full order is confirmed against your shipping date when the order is booked.

Next Step

Planning a Project for Home Game Rooms

Tell us the site count the table mix and the timeline. We will come back with a specification a price and a realistic production date.

Get a Custom Solution Email Us Download Catalogue Talk to an Engineer
WhatsApp Email